+ | =====Stepper #3 (ASML DUV) - Down for PM on April 15th-19th===== |
+ | ASML Engineers will be on-site to perform the Annual Periodic Maintenance on the tool from |
||
− | The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update. |
||
+ | Monday April 15th through April 19th. The tool will be unavailable for use during this time. |
||
+ | Please plan your work accordingly. |
||
⚫ | |||
⚫ | |||
− | =====Dicing Saw (ADT) Upgrade 10/9===== |
||
− | The dicing saw is scheduled go down for an upgrade on Monday October 9th and will be down for that week and into the weekend. Part of the upgrade will be updated software and will require users to be re-trained. I will provide more info on the re-training once I get a little hands on time with the updated software. |
||
− | I'll send out a couple of reminder emails between now and then and keep everyone updated in the event the schedule for this changes. |
||
⚫ | |||
− | ===== |
+ | =====ALD Oxford UP===== |
+ | All three chambers are operating properly. |
||
− | The tool has been scheduled for maintenance on 9-28-23 from 8:00am to 5:00pm. During this time the tool will be unavailable for use. Please plan your lab activities accordingly. |
||
− | //[[User:Mehalana v|Vraj Mehalana]] |
+ | //[[User:Mehalana v|Vraj Mehalana]] 13:48, 19 March 2024 (PDT) |
− | ===== |
+ | =====DI and Waste Water systems===== |
+ | DI and Waste Water systems will be down for upgrade April 5th and 6th. |
||
− | JEOL has finished will the install and the SEM is available to use if you've received training on SEM #1. |
||
− | //[[User: |
+ | //[[User:Mehalana v|Vraj Mehalana]] 11:55, 18 March 2024 (PDT) |
+ | =====ICP1 Down===== |
||
+ | The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
||
⚫ | |||
− | ===== |
+ | =====Job Opening: Process Engineer===== |
+ | The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details. |
||
− | We will have an FSE onsite to install the new parts on the tool and verify it is operating correctly. I don't expect this to take more than a few days, but plan for the tool to be down all week. |
||
+ | |||
⚫ | |||
+ | //[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT) |
||
+ | |||
+ | =====Lab Access Changes: Symmetry App===== |
||
+ | Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
||
+ | // [[User:John d|John d]] 13:49, 7 November 2023 (PST) |
||
+ | |||
+ | =====Wafer Bonder, (Suss SB6-8E)===== |
||
+ | SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
||
⚫ | |||
<!-- |
<!-- |
||
Line 28: | Line 38: | ||
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
--> |
--> |
||
− | <!----------------------------------------------> |
||
− | <!------------- Equipment Status ----------------> |
||
− | |||
− | |||
− | <!---------- end of Equipment Status ------------> |
||
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
||
<endfeed /> |
<endfeed /> |
Revision as of 10:26, 25 March 2024
Stepper #3 (ASML DUV) - Down for PM on April 15th-19th
ASML Engineers will be on-site to perform the Annual Periodic Maintenance on the tool from Monday April 15th through April 19th. The tool will be unavailable for use during this time.
Please plan your work accordingly.
//Vraj Mehalana 10:26, 25 March 2024 (PDT)
ALD Oxford UP
All three chambers are operating properly. //Vraj Mehalana 13:48, 19 March 2024 (PDT)
DI and Waste Water systems
DI and Waste Water systems will be down for upgrade April 5th and 6th. //Vraj Mehalana 11:55, 18 March 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Job Opening: Process Engineer
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.
//Demis D. John 14:52, 30 October 2023 (PDT)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)