=====Plasma Activation (EVG 810)=====
+
=====Stepper #3 (ASML DUV) - Down for PM on April 15th-19th=====
  +
ASML Engineers will be on-site to perform the Annual Periodic Maintenance on the tool from
We have received almost all the replacement parts for the tool except the new chuck. The original delivery date of mid June has now been pushed out to early September and they have stated that this is the best that their supplier can do. I will not be installing any new parts on the tool until we have everything.
 
  +
Monday April 15th through April 19th. The tool will be unavailable for use during this time.
  +
  +
Please plan your work accordingly.
  +
 
//[[User:Mehalana v|Vraj Mehalana]] 10:26, 25 March 2024 (PDT)
  +
 
=====ALD Oxford UP=====
  +
All three chambers are operating properly.
 
//[[User:Mehalana v|Vraj Mehalana]] 13:48, 19 March 2024 (PDT)
  +
  +
=====DI and Waste Water systems=====
  +
DI and Waste Water systems will be down for upgrade April 5th and 6th.
 
//[[User:Mehalana v|Vraj Mehalana]] 11:55, 18 March 2024 (PDT)
 
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
  +
  +
=====Job Opening: Process Engineer=====
  +
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
  +
 
//[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT)
  +
  +
=====Lab Access Changes: Symmetry App=====
  +
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
  +
  +
=====Wafer Bonder, (Suss SB6-8E)=====
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
   
Runs will still require Staff supervision until then.
 
//[[User:Mehalana v|Vraj Mehalana]] 18:01, 2 May 2023 (PDT)
 
=====E-Beam #4 (CHA) - EB4 is down=====
 
We need to replace a part on the source shutter. We should have it on Monday. I'll update when the tool is available.
 
//[[User:Mehalana v|Vraj Mehalana]] 15:26, 28 April 2023 (PDT)
 
=====Wafer Coater (S Cubed Flexi) - S3 field service=====
 
S3 will be on-site looking into our hand 2 issues on Wednesday May 3rd and 4th. They will be confirming Monday so there is a chance those days get shifted. Please plan your processing accordingly as the system will not be available while they are here looking into the problem.
 
//[[User:Mehalana v|Vraj Mehalana]] 13:54, 28 April 2023 (PDT)
 
=====FEI SEM#1 Replacement Project=====
 
The FEI SEM #1 will be removed and replaced starting Friday March 17th. Both SEMs will be shut down and the SEM room will be off limits beginning at 8 am Friday and return to normal operations Tuesday morning the 21st.
 
//[[User:Mehalana v|Vraj Mehalana]] 10:55, 16 March 2023 (PDT)
 
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!-- Description of the RSS feed -->
 
 
<!--
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
Line 22: Line 38:
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
===== Unaxis Etch: Down =====
 
We had to take the VAT controller off of this module to get the ICP-PECVD running. I have no immediate ETA for this system coming back online. Until we get this system running again you will need to use the Oxford Cobra system. -- Tony
 
// [[User:John d|John d]] 09:35, 13 February 2023 (PST)
 
===== Au Plating: UP=====
 
only the full 100mm wafer fixture is available at the moment. You can plate smaller pieces on it with no issues.
 
// [[User:Mehalana v|Vraj Mehalana]] 12:35, 15 March 2023 (PDT)
 
<!---------- end of Equipment Status ------------>
 
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<endfeed />

Revision as of 10:26, 25 March 2024

Stepper #3 (ASML DUV) - Down for PM on April 15th-19th

ASML Engineers will be on-site to perform the Annual Periodic Maintenance on the tool from Monday April 15th through April 19th. The tool will be unavailable for use during this time.

Please plan your work accordingly.

//Vraj Mehalana 10:26, 25 March 2024 (PDT)

ALD Oxford UP

All three chambers are operating properly. //Vraj Mehalana 13:48, 19 March 2024 (PDT)

DI and Waste Water systems

DI and Waste Water systems will be down for upgrade April 5th and 6th. //Vraj Mehalana 11:55, 18 March 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Job Opening: Process Engineer

The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.

//Demis D. John 14:52, 30 October 2023 (PDT)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)