=====Filmetrics F50: Down=====
+
=====Stepper #3 (ASML DUV) - Down for PM on April 15th-19th=====
  +
ASML Engineers will be on-site to perform the Annual Periodic Maintenance on the tool from
The F50-WaferMapper’s laptop has a computer/RAM failure - we are working on a repair.
 
  +
Monday April 15th through April 19th. The tool will be unavailable for use during this time.
//[[User:Mehalana v|Vraj Mehalana]] 11:09, 21 March 2023 (PDT)
 
  +
=====FEI SEM#1 Replacement Project=====
 
  +
Please plan your work accordingly.
The FEI SEM #1 will be removed and replaced starting Friday March 17th. Both SEMs will be shut down and the SEM room will be off limits beginning at 8 am Friday and return to normal operations Tuesday morning the 21st.
 
  +
//[[User:Mehalana v|Vraj Mehalana]] 10:55, 16 March 2023 (PDT)
+
//[[User:Mehalana v|Vraj Mehalana]] 10:26, 25 March 2024 (PDT)
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
  +
<!-- Description of the RSS feed -->
 
 
=====ALD Oxford UP=====
  +
All three chambers are operating properly.
  +
//[[User:Mehalana v|Vraj Mehalana]] 13:48, 19 March 2024 (PDT)
  +
  +
=====DI and Waste Water systems=====
  +
DI and Waste Water systems will be down for upgrade April 5th and 6th.
 
//[[User:Mehalana v|Vraj Mehalana]] 11:55, 18 March 2024 (PDT)
 
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
  +
  +
=====Job Opening: Process Engineer=====
  +
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
  +
 
//[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT)
  +
  +
=====Lab Access Changes: Symmetry App=====
  +
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
  +
  +
=====Wafer Bonder, (Suss SB6-8E)=====
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
  +
 
<!--
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
Line 14: Line 38:
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
===== Unaxis Etch: Down =====
 
We had to take the VAT controller off of this module to get the ICP-PECVD running. I have no immediate ETA for this system coming back online. Until we get this system running again you will need to use the Oxford Cobra system. -- Tony
 
// [[User:John d|John d]] 09:35, 13 February 2023 (PST)
 
 
===== Dektak XT ready for training =====
 
We have replaced the Dektak 6M with a new Dektak XT profilometer. The system is available for training, please [[Aidan_Hopkins|contact the tool supervisor]].
 
// [[User:John d|John d]] 10:08, 7 February 2023 (PST)
 
 
===== Au Plating: UP=====
 
only the full 100mm wafer fixture is available at the moment. You can plate smaller pieces on it with no issues.
 
// [[User:Mehalana v|Vraj Mehalana]] 12:35, 15 March 2023 (PDT)
 
 
<!---------- end of Equipment Status ------------>
 
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<endfeed />
Line 35: Line 43:
 
<!--------------------------------------------
 
<!--------------------------------------------
 
====== HOW TO ADD ITEMS ======
 
====== HOW TO ADD ITEMS ======
 
 
* You can copy/paste the example below for a new news item.
 
* You can copy/paste the example below for a new news item.
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)

Revision as of 10:26, 25 March 2024

Stepper #3 (ASML DUV) - Down for PM on April 15th-19th

ASML Engineers will be on-site to perform the Annual Periodic Maintenance on the tool from Monday April 15th through April 19th. The tool will be unavailable for use during this time.

Please plan your work accordingly.

//Vraj Mehalana 10:26, 25 March 2024 (PDT)

ALD Oxford UP

All three chambers are operating properly. //Vraj Mehalana 13:48, 19 March 2024 (PDT)

DI and Waste Water systems

DI and Waste Water systems will be down for upgrade April 5th and 6th. //Vraj Mehalana 11:55, 18 March 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Job Opening: Process Engineer

The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.

//Demis D. John 14:52, 30 October 2023 (PDT)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)