Difference between revisions of "Template:Announcements"
Mehalana v (talk | contribs) |
|||
(175 intermediate revisions by 7 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
+ | =====Stepper #3 (ASML DUV) - Down for PM on April 15th-19th===== |
||
− | <!--feedBurner name="UCSBNanofab-Announcements" /--> |
||
+ | ASML Engineers will be on-site to perform the Annual Periodic Maintenance on the tool from |
||
− | <!-- Description of the RSS feed --> |
||
+ | Monday April 15th through April 19th. The tool will be unavailable for use during this time. |
||
− | '''''Important Announcements''''' |
||
⚫ | |||
− | <!-- |
||
⚫ | |||
+ | Please plan your work accordingly. |
||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
+ | //[[User:Mehalana v|Vraj Mehalana]] 10:26, 25 March 2024 (PDT) |
||
⚫ | |||
− | All of the damaged parts have been repaired and we should receive them next week. I'm hopeful we'll have the system running by Thursday or Friday. -- Tony |
||
⚫ | |||
− | ===== |
+ | =====ALD Oxford UP===== |
+ | All three chambers are operating properly. |
||
− | We have replaced the Dektak 6M with a new Dektak XT profilometer. We are currently qualifying the tool, we'll send an email when it's ready for training. |
||
− | // |
+ | //[[User:Mehalana v|Vraj Mehalana]] 13:48, 19 March 2024 (PDT) |
− | |||
− | ===== Au Plating: DOWN ===== |
||
− | Bath damaged, system is down for repair. |
||
⚫ | |||
+ | =====DI and Waste Water systems===== |
||
+ | DI and Waste Water systems will be down for upgrade April 5th and 6th. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 11:55, 18 March 2024 (PDT) |
||
+ | =====ICP1 Down===== |
||
+ | The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
||
+ | =====Job Opening: Process Engineer===== |
||
+ | The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details. |
||
⚫ | |||
+ | =====Lab Access Changes: Symmetry App===== |
||
+ | Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
||
⚫ | |||
⚫ | |||
+ | SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST) |
||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
+ | <endfeed /> |
||
+ | <noinclude>[[Category:Templates]]</noinclude> |
||
⚫ | |||
====== HOW TO ADD ITEMS ====== |
====== HOW TO ADD ITEMS ====== |
||
− | |||
* You can copy/paste the example below for a new news item. |
* You can copy/paste the example below for a new news item. |
||
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
Revision as of 10:26, 25 March 2024
Stepper #3 (ASML DUV) - Down for PM on April 15th-19th
ASML Engineers will be on-site to perform the Annual Periodic Maintenance on the tool from Monday April 15th through April 19th. The tool will be unavailable for use during this time.
Please plan your work accordingly.
//Vraj Mehalana 10:26, 25 March 2024 (PDT)
ALD Oxford UP
All three chambers are operating properly. //Vraj Mehalana 13:48, 19 March 2024 (PDT)
DI and Waste Water systems
DI and Waste Water systems will be down for upgrade April 5th and 6th. //Vraj Mehalana 11:55, 18 March 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Job Opening: Process Engineer
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.
//Demis D. John 14:52, 30 October 2023 (PDT)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)