Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(DUV Scope update)
(309 intermediate revisions by 7 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
  +
=====Stepper #3 (ASML DUV) - Down for PM on April 15th-19th=====
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
  +
ASML Engineers will be on-site to perform the Annual Periodic Maintenance on the tool from
<!-- Description of the RSS feed -->
 
  +
Monday April 15th through April 19th. The tool will be unavailable for use during this time.
'''''Important Announcements'''''
 
----
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
   
  +
Please plan your work accordingly.
In order for your post to show up correctly, you need to:
 
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
   
 
//[[User:Mehalana v|Vraj Mehalana]] 10:26, 25 March 2024 (PDT)
===== New COVID protocols =====
 
Please read the linked letter below (on Wiki) regarding masking policy changes, effective Saturday, March 19.
 
   
  +
=====ALD Oxford UP=====
The nanofab will follow this policy with masks being optional for everyone in all sections of the facility beginning March 19.
 
  +
All three chambers are operating properly.
  +
//[[User:Mehalana v|Vraj Mehalana]] 13:48, 19 March 2024 (PDT)
   
  +
=====DI and Waste Water systems=====
All users must adhere to the campus policies as outlined in the letter from Chancellor Yang, including testing where required.
 
  +
DI and Waste Water systems will be down for upgrade April 5th and 6th.
  +
//[[User:Mehalana v|Vraj Mehalana]] 11:55, 18 March 2024 (PDT)
  +
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
   
  +
=====Job Opening: Process Engineer=====
Link: [https://t.e2ma.net/message/opq87n/0equghb March 16th 2022- Letter from Office of the Chancellor]
 
  +
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
   
  +
//[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT)
See the full policies at '''[[COVID-19_User_Policies]]'''
 
// [[User:John d|John d]] 16:08, 21 March 2022 (PDT)
 
   
===== LEXT Confocal: DOWN =====
+
=====Lab Access Changes: Symmetry App=====
  +
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
LEXT Confocal microscope is down, please check email for updates.
 
// [[User:John d|John d]] 16:08, 21 March 2022 (PDT)
+
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
   
===== DUV Scope: Vis only =====
+
=====Wafer Bonder, (Suss SB6-8E)=====
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
The DUV camera on the DUV Microscope has failed, and can not be replaced/repaired. The microscope is up as a digital visible microscope only.
 
// [[User:John d|John d]] 14:08, 23 March 2022 (PDT)
+
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
   
 
<!--
===== New EBL Rates =====
 
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows:
 
 
In order for your post to show up correctly, you need to:
 
 
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
Industrial Users: $405/hour
 
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
 
-->
UC Academic Users: $126/hour
 
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
Non-UC Academic Users: $150/hour
 
 
UCSB CNSI Incubator USers: $260/hour
 
 
//[[User:Thibeault|Thibeault]] 12:21, 9 December 2021 (PST)
 
 
 
<!---------- end of Equipment Status ------------>
 
<!---------------------------------------------->
 
 
<endfeed />
 
<endfeed />
 
<noinclude>[[Category:Templates]]</noinclude>
 
<noinclude>[[Category:Templates]]</noinclude>
 
<!--------------------------------------------
 
<!--------------------------------------------
 
====== HOW TO ADD ITEMS ======
 
 
 
 
====== HOW TO ADD NEWS ITEMS ======
 
 
 
* You can copy/paste the example below for a new news item.
 
* You can copy/paste the example below for a new news item.
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
* You must add a user signature at the end of each post via four tildes: ~~~~. Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
+
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
Line 74: Line 58:
 
===== NanoFab making LN2 icecream =====
 
===== NanoFab making LN2 icecream =====
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
  +
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST)
// ~~~~
 
   
 
************* (end of example) **************
 
************* (end of example) **************
The ~~~~ will be replaced with your username & timestamp after you submit the post.
+
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post.
 
---------------------------------------------->
 
---------------------------------------------->

Revision as of 10:26, 25 March 2024

Stepper #3 (ASML DUV) - Down for PM on April 15th-19th

ASML Engineers will be on-site to perform the Annual Periodic Maintenance on the tool from Monday April 15th through April 19th. The tool will be unavailable for use during this time.

Please plan your work accordingly.

//Vraj Mehalana 10:26, 25 March 2024 (PDT)

ALD Oxford UP

All three chambers are operating properly. //Vraj Mehalana 13:48, 19 March 2024 (PDT)

DI and Waste Water systems

DI and Waste Water systems will be down for upgrade April 5th and 6th. //Vraj Mehalana 11:55, 18 March 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Job Opening: Process Engineer

The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.

//Demis D. John 14:52, 30 October 2023 (PDT)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)