Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(Deleted Flu vacc. mandate)
(318 intermediate revisions by 7 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
  +
=====Stepper #3 (ASML DUV) - Down for PM on April 15th-19th=====
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
  +
ASML Engineers will be on-site to perform the Annual Periodic Maintenance on the tool from
<!-- Description of the RSS feed -->
 
  +
Monday April 15th through April 19th. The tool will be unavailable for use during this time.
'''''Important Announcements'''''
 
----
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
   
  +
Please plan your work accordingly.
In order for your post to show up correctly, you need to:
 
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
===== Jan 2022 UCSB COVID Protocols =====
 
See the UCSB Email for [https://t.e2ma.net/webview/ftggrf/f0886911cb138b340f9d784d1035be8a Jan 2022 Return to Campus] for full information. Useful links are pasted below.
 
   
  +
//[[User:Mehalana v|Vraj Mehalana]] 10:26, 25 March 2024 (PDT)
* All students who will be on campus during Winter Quarter are required to obtain a campus COVID-19 test at the beginning of the quarter.
 
   
  +
=====ALD Oxford UP=====
* [https://t.e2ma.net/click/bmsprf/bafvpn/r6ygiy Testing is available] to the campus community without charge. Please pick up a UCSB COVID-19 test kit at Loma Pelona any weekday starting 1/3/2022 between 8:30 am and 4:45 pm. You will then use the kit to provide your saliva sample (at home or at some other convenient location for you) and return it to Loma Pelona at your appointment time, which must be within 24 hours of making the sample. Appointments can be made through the [https://t.e2ma.net/click/bmsprf/bafvpn/7yzgiy Student Health Patient Portal].
 
  +
All three chambers are operating properly.
  +
//[[User:Mehalana v|Vraj Mehalana]] 13:48, 19 March 2024 (PDT)
   
  +
=====DI and Waste Water systems=====
* Booster vaccines are required for all eligible staff, faculty, and students, as part of [https://t.e2ma.net/click/bmsprf/bafvpn/3j1giy UC’s SARS-CoV-2 Vaccine Program policy], in order to access UC facilities. Individuals with previously approved medical or religious exemptions are also exempt from booster requirements.
 
  +
DI and Waste Water systems will be down for upgrade April 5th and 6th.
  +
//[[User:Mehalana v|Vraj Mehalana]] 11:55, 18 March 2024 (PDT)
  +
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
   
  +
=====Job Opening: Process Engineer=====
* Booster doses are widely available at pharmacies and medical clinics. Boosters will also be [https://t.e2ma.net/click/bmsprf/bafvpn/jc2giy available in Isla Vista from the Santa Barbara County Department of Public Health] at Embarcadero Hall January 10 - 28 on weekdays from 9 am - 5 pm, with appointments available through the [https://t.e2ma.net/click/bmsprf/bafvpn/z42giy MyTurn system].
 
  +
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
: Influenza vaccinations are also required, unless you attest that you have read the educational information and decline, AND agree to mask through the end of flu season.
 
   
  +
//[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT)
* The campus mask mandate does not distinguish “shared” or “public” spaces from other locations. All indoor spaces on campus, including research spaces, are subject to the masking requirement, with the exception of individual residences in campus housing, dining halls while eating, or individual offices with one person with the door closed.
 
: Everyone is encouraged to wear a mask outdoors in crowded settings when on campus.
 
   
  +
=====Lab Access Changes: Symmetry App=====
// [[User:John d|John d]] 12:33, 3 January 2022 (PST)
 
  +
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
  +
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
   
===== New EBL Rates =====
+
=====Wafer Bonder, (Suss SB6-8E)=====
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows:
 
 
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
   
 
<!--
Industrial Users: $405/hour
 
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
 
In order for your post to show up correctly, you need to:
UC Academic Users: $126/hour
 
 
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
 
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
Non-UC Academic Users: $150/hour
 
 
-->
 
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
UCSB CNSI Incubator USers: $260/hour
 
 
//[[User:Thibeault|Thibeault]] 12:21, 9 December 2021 (PST)
 
 
===== January GCA Vendor Service =====
 
The vendor will be here starting Monday January 17, 2022 at 8:00am to service the Autosep. The stage will be removed, so the machine will not be available for use in the evening. Service will conclude Wednesday January 19, 2022 at 5:00pm. Please schedule your process accordingly.
 
 
The vendor will be here to service the 6300-stepper starting Thursday January 20, 2022 at 8am. The system should be available by 5pm the same day. Please schedule your process accordingly.
 
[[User:Silva|Silva]] 09:14, 21 December 2021 (PST)
 
 
===== New COVID Protocols =====
 
All facility users and visitors are now required to have masks on while indoors in shared spaces. This includes shared offices, hallways/corridors, and all shared laboratory spaces. Masks will be worn in all laboratories at all times and in all shared office spaces at all times.
 
 
Surgical style masks or KN95 masks are appropriate for cleanroom use. Cloth masks may be used in non-cleanroom spaces.
 
 
This direction applies to all vaccinated and non-vaccinated persons. Outdoor policies remain unchanged.
 
 
See the full policies at '''[[COVID-19_User_Policies]]'''
 
 
// [[User:Hopkins a|Hopkins a]] 08:14, 6 August 2021 (PDT)
 
 
 
 
<!---------- end of Equipment Status ------------>
 
<!---------------------------------------------->
 
 
<endfeed />
 
<endfeed />
 
<noinclude>[[Category:Templates]]</noinclude>
 
<noinclude>[[Category:Templates]]</noinclude>
 
<!--------------------------------------------
 
<!--------------------------------------------
 
====== HOW TO ADD ITEMS ======
 
 
 
 
====== HOW TO ADD NEWS ITEMS ======
 
 
 
* You can copy/paste the example below for a new news item.
 
* You can copy/paste the example below for a new news item.
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
* You must add a user signature at the end of each post via four tildes: ~~~~. Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
+
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
 
* Please use "There are no announcements at this time." if the announcements are empty.
 
* Please use "There are no announcements at this time." if the announcements are empty.
   
* URL to the RSS feed via FeedBurner (for Samsung display): http://feeds.feedburner.com/UCSBNanofab-Announcements?format=xml
+
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
* URL to the RSS feed directly from Wiki: https://www.nanotech.ucsb.edu/wiki/index.php?title=Template:Announcements&action=feed&feed=rss
+
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
   
   
Line 88: Line 58:
 
===== NanoFab making LN2 icecream =====
 
===== NanoFab making LN2 icecream =====
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
 
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST)
// ~~~~
 
   
 
************* (end of example) **************
 
************* (end of example) **************
The ~~~~ will be replaced with your username & timestamp after you submit the post.
+
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post.
 
---------------------------------------------->
 
---------------------------------------------->

Revision as of 10:26, 25 March 2024

Stepper #3 (ASML DUV) - Down for PM on April 15th-19th

ASML Engineers will be on-site to perform the Annual Periodic Maintenance on the tool from Monday April 15th through April 19th. The tool will be unavailable for use during this time.

Please plan your work accordingly.

//Vraj Mehalana 10:26, 25 March 2024 (PDT)

ALD Oxford UP

All three chambers are operating properly. //Vraj Mehalana 13:48, 19 March 2024 (PDT)

DI and Waste Water systems

DI and Waste Water systems will be down for upgrade April 5th and 6th. //Vraj Mehalana 11:55, 18 March 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Job Opening: Process Engineer

The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.

//Demis D. John 14:52, 30 October 2023 (PDT)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)