Difference between revisions of "Template:Announcements"
(afm down) |
Mehalana v (talk | contribs) |
||
(723 intermediate revisions by 8 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
+ | =====Stepper #3 (ASML DUV) - Down for PM on April 15th-19th===== |
||
− | <!--feedBurner name="UCSBNanofab-Announcements" /--> |
||
+ | ASML Engineers will be on-site to perform the Annual Periodic Maintenance on the tool from |
||
− | <!-- Description of the RSS feed --> |
||
+ | Monday April 15th through April 19th. The tool will be unavailable for use during this time. |
||
− | ''UCSB NanoFab Announcements'' |
||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
− | <!------------- Announcements ----------------> |
||
+ | Please plan your work accordingly. |
||
− | ===== LAB CLOSED for 1 hr on Monday ===== |
||
− | The lab will be down from 7:30am to 8:30am on Monday, June 11th so campus facilities can install a new controller for the cleanroom air handlers. This should be a pretty quick and easy procedure but as a precautionary measure no one will be allowed in the lab at this time. We will send out an email as soon as the lab is safe to enter. Please plan accordingly and let me know if you have any questions. |
||
⚫ | |||
+ | //[[User:Mehalana v|Vraj Mehalana]] 10:26, 25 March 2024 (PDT) |
||
⚫ | |||
− | The laser/laser focus is struggling on the AFM. I will be removing |
||
− | the head and taking it to Bruker for a tune-up/repair this afternoon |
||
− | . The system will be down until some time next week. |
||
⚫ | |||
− | ===== |
+ | =====ALD Oxford UP===== |
+ | All three chambers are operating properly. |
||
− | I have disabled the auto refill due to a high water level. There is however a manual fill and a manual drain button at the center top of the head case. It was the old fill and drain for the ultrasonic sink that was once in the bench. So users using the bath might need to fill or drain as you put your beaker in. Please be careful with other user's beakers. |
||
− | // |
+ | //[[User:Mehalana v|Vraj Mehalana]] 13:48, 19 March 2024 (PDT) |
− | ===== |
+ | =====DI and Waste Water systems===== |
+ | DI and Waste Water systems will be down for upgrade April 5th and 6th. |
||
− | We have received a new bottle of SiCl4 and we are installing a new |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 11:55, 18 March 2024 (PDT) |
||
− | gas panel. We will notify you when the gas is available. |
||
⚫ | |||
⚫ | |||
+ | The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
||
− | ===== |
+ | =====Job Opening: Process Engineer===== |
+ | The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details. |
||
− | Wafer recovered, system up. |
||
⚫ | |||
⚫ | |||
⚫ | |||
− | The Plasma Therm Cortex software update is complete, and the system is operational. Standard recipes requalified. Particle counts are now much lower and around historical levels. All users need retraining on the new software. Contact Mike Silva for training. |
||
− | // [[User:Thibeault|Thibeault]] 17:25, 24 May 2018 (PDT) |
||
+ | =====Lab Access Changes: Symmetry App===== |
||
+ | Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
||
⚫ | |||
+ | =====Wafer Bonder, (Suss SB6-8E)===== |
||
− | <!---------- end of announcements ------------> |
||
+ | SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
||
− | <!----------------------------------------------> |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST) |
||
+ | |||
⚫ | |||
⚫ | |||
+ | In order for your post to show up correctly, you need to: |
||
+ | >> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post ===== |
||
+ | >> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
⚫ | |||
⚫ | |||
<endfeed /> |
<endfeed /> |
||
<noinclude>[[Category:Templates]]</noinclude> |
<noinclude>[[Category:Templates]]</noinclude> |
||
<!-------------------------------------------- |
<!-------------------------------------------- |
||
⚫ | |||
− | |||
+ | * You can copy/paste the example below for a new news item. |
||
− | |||
− | |||
− | |||
− | ====== HOW TO ADD NEWS ITEMS ====== |
||
− | |||
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
||
− | * You must add a user signature at the end of each post via four tildes: |
+ | * You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed. |
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
||
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
||
* Please use "There are no announcements at this time." if the announcements are empty. |
* Please use "There are no announcements at this time." if the announcements are empty. |
||
+ | |||
+ | * URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
||
+ | * URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
||
Line 59: | Line 58: | ||
===== NanoFab making LN2 icecream ===== |
===== NanoFab making LN2 icecream ===== |
||
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
||
⚫ | |||
− | // ~~~~ |
||
− | (end of example) |
+ | ************* (end of example) ************** |
− | The |
+ | The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post. |
----------------------------------------------> |
----------------------------------------------> |
Revision as of 10:26, 25 March 2024
Stepper #3 (ASML DUV) - Down for PM on April 15th-19th
ASML Engineers will be on-site to perform the Annual Periodic Maintenance on the tool from Monday April 15th through April 19th. The tool will be unavailable for use during this time.
Please plan your work accordingly.
//Vraj Mehalana 10:26, 25 March 2024 (PDT)
ALD Oxford UP
All three chambers are operating properly. //Vraj Mehalana 13:48, 19 March 2024 (PDT)
DI and Waste Water systems
DI and Waste Water systems will be down for upgrade April 5th and 6th. //Vraj Mehalana 11:55, 18 March 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Job Opening: Process Engineer
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.
//Demis D. John 14:52, 30 October 2023 (PDT)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)