+ | =====Stepper #3 (ASML DUV) - Down for PM on April 15th-19th===== |
||
− | <!--feedBurner name="UCSBNanofab-Announcements" /--> |
||
+ | ASML Engineers will be on-site to perform the Annual Periodic Maintenance on the tool from |
||
− | <!-- Description of the RSS feed --> |
||
+ | Monday April 15th through April 19th. The tool will be unavailable for use during this time. |
||
− | ''UCSB NanoFab Announcements'' |
||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
− | <!------------- Announcements ----------------> |
||
+ | Please plan your work accordingly. |
||
− | ===== Solvent Bench Bay 7 - Bath & Bench up ===== |
||
− | The Heated bath in bay 7 is up and ready to use. It is at 80 c now and has a new auto refill as well as a manual fill. Mike Day will be inspecting the bath every morning for water level, contaminated water as well as feed back from all you guys. We know there will most likely be a little fine tuning, So please give Mike Day your feed back. |
||
⚫ | |||
+ | //[[User:Mehalana v|Vraj Mehalana]] 10:26, 25 March 2024 (PDT) |
||
− | ===== RIE#5: No SiCl4 ===== |
||
− | We have received a new bottle of SiCl4 and we are installing a new |
||
− | gas panel. We will notify you when the gas is available. |
||
⚫ | |||
− | ===== |
+ | =====ALD Oxford UP===== |
+ | All three chambers are operating properly. |
||
− | Door replaced, system up. |
||
− | // |
+ | //[[User:Mehalana v|Vraj Mehalana]] 13:48, 19 March 2024 (PDT) |
− | ===== |
+ | =====DI and Waste Water systems===== |
+ | DI and Waste Water systems will be down for upgrade April 5th and 6th. |
||
− | The Plasma Therm Cortex software update is complete, and the system is operational. Standard recipes requalified. Particle counts are now much lower and around historical levels. All users need retraining on the new software. Contact Mike Silva for training. |
||
− | // |
+ | //[[User:Mehalana v|Vraj Mehalana]] 11:55, 18 March 2024 (PDT) |
+ | =====ICP1 Down===== |
||
+ | The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
||
+ | =====Job Opening: Process Engineer===== |
||
+ | The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details. |
||
⚫ | |||
− | <!---------- end of announcements ------------> |
||
+ | |||
− | <!----------------------------------------------> |
||
+ | =====Lab Access Changes: Symmetry App===== |
||
+ | Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
||
⚫ | |||
+ | |||
+ | =====Wafer Bonder, (Suss SB6-8E)===== |
||
+ | SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST) |
||
+ | |||
⚫ | |||
⚫ | |||
+ | In order for your post to show up correctly, you need to: |
||
+ | >> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post ===== |
||
+ | >> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
⚫ | |||
⚫ | |||
<endfeed /> |
<endfeed /> |
||
<noinclude>[[Category:Templates]]</noinclude> |
<noinclude>[[Category:Templates]]</noinclude> |
||
<!-------------------------------------------- |
<!-------------------------------------------- |
||
⚫ | |||
− | |||
+ | * You can copy/paste the example below for a new news item. |
||
− | |||
− | |||
− | |||
⚫ | |||
− | |||
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
||
− | * You must add a user signature at the end of each post via four tildes: |
+ | * You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed. |
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
||
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
||
* Please use "There are no announcements at this time." if the announcements are empty. |
* Please use "There are no announcements at this time." if the announcements are empty. |
||
+ | |||
+ | * URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
||
+ | * URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
||
Line 49: | Line 58: | ||
===== NanoFab making LN2 icecream ===== |
===== NanoFab making LN2 icecream ===== |
||
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
||
+ | // [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) |
||
− | // ~~~~ |
||
− | (end of example) |
+ | ************* (end of example) ************** |
− | The |
+ | The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post. |
----------------------------------------------> |
----------------------------------------------> |
Revision as of 10:26, 25 March 2024
Stepper #3 (ASML DUV) - Down for PM on April 15th-19th
ASML Engineers will be on-site to perform the Annual Periodic Maintenance on the tool from Monday April 15th through April 19th. The tool will be unavailable for use during this time.
Please plan your work accordingly.
//Vraj Mehalana 10:26, 25 March 2024 (PDT)
ALD Oxford UP
All three chambers are operating properly. //Vraj Mehalana 13:48, 19 March 2024 (PDT)
DI and Waste Water systems
DI and Waste Water systems will be down for upgrade April 5th and 6th. //Vraj Mehalana 11:55, 18 March 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Job Opening: Process Engineer
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.
//Demis D. John 14:52, 30 October 2023 (PDT)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)