Difference between revisions of "Template:Announcements"
(pecvd2 update) |
Mehalana v (talk | contribs) |
||
(762 intermediate revisions by 8 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
+ | =====Stepper #3 (ASML DUV) - Down for PM on April 15th-19th===== |
||
− | <!--feedBurner name="UCSBNanofab-Announcements" /--> |
||
+ | ASML Engineers will be on-site to perform the Annual Periodic Maintenance on the tool from |
||
− | <!-- Description of the RSS feed --> |
||
+ | Monday April 15th through April 19th. The tool will be unavailable for use during this time. |
||
− | ''UCSB NanoFab Announcements'' |
||
⚫ | |||
− | '''How to add new news items''' |
||
+ | Please plan your work accordingly. |
||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
+ | =====ALD Oxford UP===== |
||
− | Example of a new post: |
||
+ | All three chambers are operating properly. |
||
⚫ | |||
− | ===== |
+ | =====DI and Waste Water systems===== |
+ | DI and Waste Water systems will be down for upgrade April 5th and 6th. |
||
⚫ | |||
⚫ | |||
− | // ~~~~ |
||
⚫ | |||
+ | The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
||
+ | =====Job Opening: Process Engineer===== |
||
+ | The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details. |
||
⚫ | |||
− | (end of example) |
||
⚫ | |||
+ | =====Lab Access Changes: Symmetry App===== |
||
+ | Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
||
+ | // [[User:John d|John d]] 13:49, 7 November 2023 (PST) |
||
+ | |||
+ | =====Wafer Bonder, (Suss SB6-8E)===== |
||
+ | SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST) |
||
+ | |||
⚫ | |||
+ | SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
||
+ | In order for your post to show up correctly, you need to: |
||
+ | >> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post ===== |
||
+ | >> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
--> |
--> |
||
− | <!--------- |
+ | <!---------DO NOT EDIT BELOW THIS LINE-----------> |
⚫ | |||
⚫ | |||
⚫ | |||
− | ===== Stepper #2 AutoStep: UP ===== |
||
⚫ | |||
− | One RMS motor and motor control board was replaced. I ran setup |
||
+ | ====== HOW TO ADD ITEMS ====== |
||
− | without error. The system is up and ready for your use. |
||
+ | * You can copy/paste the example below for a new news item. |
||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
+ | * URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
||
− | ===== PECVD#2 Upgrades in progress, Retraining required ===== |
||
+ | * URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
||
− | The Plasma Therm Cortex software update is complete, and the system is operational. We still have some work to do before we start training users. We need to check particulate counts, and we need to qualify all the standard process recipes. |
||
− | If everything goes well with particulates, and film quality, we will start training sessions early next week. |
||
⚫ | |||
− | ===== RIE#5 Up, SiCl4 unavailable ===== |
||
− | The SiCl4 gas line is down until next week when we can change the gas |
||
− | panel. |
||
⚫ | |||
+ | ******** EXAMPLE OF A NEW POST ******** |
||
⚫ | |||
− | UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options. |
||
⚫ | |||
+ | ===== NanoFab making LN2 icecream ===== |
||
− | <!---------- end of announcements ------------> |
||
⚫ | |||
⚫ | |||
+ | // [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) |
||
⚫ | |||
+ | |||
⚫ | |||
+ | ************* (end of example) ************** |
||
⚫ | |||
⚫ |
Revision as of 10:26, 25 March 2024
Stepper #3 (ASML DUV) - Down for PM on April 15th-19th
ASML Engineers will be on-site to perform the Annual Periodic Maintenance on the tool from Monday April 15th through April 19th. The tool will be unavailable for use during this time.
Please plan your work accordingly.
//Vraj Mehalana 10:26, 25 March 2024 (PDT)
ALD Oxford UP
All three chambers are operating properly. //Vraj Mehalana 13:48, 19 March 2024 (PDT)
DI and Waste Water systems
DI and Waste Water systems will be down for upgrade April 5th and 6th. //Vraj Mehalana 11:55, 18 March 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Job Opening: Process Engineer
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.
//Demis D. John 14:52, 30 October 2023 (PDT)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)