Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(deleted EB4, other tools up. Updated ICP1 and DSE from emails.)
(moved RIE5 below DSE and ICP1)
Line 1: Line 1:
=====RIE 5 is up=====
+
=====PlasmaTherm DSEIII is down - Update=====
RIE 5 is up except for processes that use SiCl4.
 
 
//[[User:Mehalana v|Vraj Mehalana]] 09:39, 30 January 2024 (PST)
 
 
=====Dry Etch, Si Deep RIE (PlasmaTherm DSEIII) - DSE Update=====
 
 
We were able to start running recipes last night but we found the C4F8 MFC wasn’t controlling. I’ve ordered a new MFC that’s due to be on site Tuesday morning. If all goes well the tool should be up that afternoon.
 
We were able to start running recipes last night but we found the C4F8 MFC wasn’t controlling. I’ve ordered a new MFC that’s due to be on site Tuesday morning. If all goes well the tool should be up that afternoon.
 
//[[User:John_d|Demis D. John]] 11:18, 23 February 2024 (PST)
 
//[[User:John_d|Demis D. John]] 11:18, 23 February 2024 (PST)
Line 11: Line 6:
 
Some additional work is needed on the replacement board that we are waiting on. I have been informed that it will not be shipping until after the 20th (no solid date).
 
Some additional work is needed on the replacement board that we are waiting on. I have been informed that it will not be shipping until after the 20th (no solid date).
 
//[[User:John_d|Demis D. John]] 11:18, 23 February 2024 (PST)
 
//[[User:John_d|Demis D. John]] 11:18, 23 February 2024 (PST)
  +
  +
=====RIE 5 is up=====
 
RIE 5 is up except for processes that use SiCl4.
 
//[[User:Mehalana v|Vraj Mehalana]] 09:39, 30 January 2024 (PST)
   
 
=====EBeam3 Transfer Arm Upgrade - Postponed=====
 
=====EBeam3 Transfer Arm Upgrade - Postponed=====
Line 18: Line 17:
   
 
I will send another notification when everything has been worked out, and I am ready to schedule the installation.
 
I will send another notification when everything has been worked out, and I am ready to schedule the installation.
 
 
//[[User:John_d|Demis D. John]] 11:56, 13 February 2024 (PST)
 
//[[User:John_d|Demis D. John]] 11:56, 13 February 2024 (PST)
   
Line 28: Line 26:
 
=====Lab Access Changes: Symmetry App=====
 
=====Lab Access Changes: Symmetry App=====
 
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
 
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
 
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
   

Revision as of 12:20, 23 February 2024

PlasmaTherm DSEIII is down - Update

We were able to start running recipes last night but we found the C4F8 MFC wasn’t controlling. I’ve ordered a new MFC that’s due to be on site Tuesday morning. If all goes well the tool should be up that afternoon. //Demis D. John 11:18, 23 February 2024 (PST)

ICP #1 is down - Update

Some additional work is needed on the replacement board that we are waiting on. I have been informed that it will not be shipping until after the 20th (no solid date). //Demis D. John 11:18, 23 February 2024 (PST)

RIE 5 is up

RIE 5 is up except for processes that use SiCl4. //Vraj Mehalana 09:39, 30 January 2024 (PST)

EBeam3 Transfer Arm Upgrade - Postponed

The Transfer Arm upgrade has been postponed again, this time due to motor driver compatibility issues.

I am waiting to hear back from the manufacturer so at this time I can not reschedule yet.

I will send another notification when everything has been worked out, and I am ready to schedule the installation. //Demis D. John 11:56, 13 February 2024 (PST)

Job Opening: Process Engineer

The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.

//Demis D. John 14:52, 30 October 2023 (PDT)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)