Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
m (Reverted edits by Mehalana v (talk) to last revision by John d)
Tag: Rollback
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
=====Field Emission SEM #2 (JEOL 7600F) - IMPORTANT=====
+
=====NanoFad Lab is UP=====
  +
The cleanroom is back up and running and you are welcomed back into the lab. Please check your emails for individual equipment status. Sorry for the inconvenience.
Once SEM 1 is up we’ll wait for at least a week before we decommission SEM 2.
 
//[[User:Mehalana v|Vraj Mehalana]] 11:12, 12 July 2023 (PDT)
+
//11:32, 14 June 2023 (PDT)
   
 
=====Plasma Activation (EVG 810)=====
 
=====Plasma Activation (EVG 810)=====

Revision as of 11:13, 12 July 2023

NanoFad Lab is UP

The cleanroom is back up and running and you are welcomed back into the lab. Please check your emails for individual equipment status. Sorry for the inconvenience. //11:32, 14 June 2023 (PDT)

Plasma Activation (EVG 810)

We have received almost all the replacement parts for the tool except the new chuck. The original delivery date of mid June has now been pushed out to early September and they have stated that this is the best that their supplier can do. I will not be installing any new parts on the tool until we have everything. Runs will still require Staff supervision until then. //Vraj Mehalana 18:01, 2 May 2023 (PDT)