Difference between revisions of "Template:Announcements"
Jump to navigation
Jump to search
(added GCA Autostep service (Millerski)) |
(ASML Dec 12th Laser PM) |
||
(40 intermediate revisions by 4 users not shown) | |||
Line 14: | Line 14: | ||
<!------------- Equipment Status ----------------> |
<!------------- Equipment Status ----------------> |
||
− | ===== |
+ | ===== MA6: service 11/30 ===== |
+ | The MA6 will be unavailable on Wednesday 11/30 beginning around 7:15 am until around 5 pm. We'll send out an email that day once the service is completed. |
||
− | Stepper #2 (GCA AutoStep200) will be unavailable for use while maintenance tasks are performed on the following dates: |
||
⚫ | |||
⚫ | |||
− | 9-28-22 at 8:00am to 9-29-22 at 5:00pm |
||
+ | On Dec 12th the system will be down for half a day, so we can perform periodic maintenance (PM) on the DUV Laser. |
||
⚫ | |||
⚫ | |||
⚫ | |||
+ | Bath damaged, system is down for repair. |
||
⚫ | |||
− | ===== |
+ | ===== E-Beam#2: Heater Down ===== |
+ | EB2 Heated Processing is down |
||
⚫ | |||
+ | ===== NanoFab Job Openings ===== |
||
− | The MLA will be down beginning the evening of Monday October 3rd and should be back up sometime Friday October 7th. |
||
+ | The NanoFab has current job openings, apply at: [https://wiki.nanotech.ucsb.edu/wiki/Nanofab_Job_Postings '''NanoFab Job Postings'''] |
||
− | // [[User:Sawyer l|L Sawyer]] 13:32, 31 August 2022 (PDT) |
||
⚫ | |||
− | ===== Chlorine gasses available ===== |
||
− | All Cl2 processes are now available for your use. |
||
− | |||
⚫ | |||
− | |||
⚫ | |||
− | |||
− | We are running a newer computer; |
||
− | Nanofiles sync & JobCreator functionality will be restored in the next few weeks. |
||
− | |||
⚫ | |||
− | |||
− | ===== Face-Masks Optional as of June 13 ===== |
||
− | You are not required to wear a mask in UC buildings at this time. You are also not required to wear a mask in the Nanofab if desired. |
||
− | |||
− | We will still provide masks at the metal table in front of the cleanroom entry. |
||
− | See the [https://t.e2ma.net/webview/be2nag/25634e9f535619ce1f4eb976598e7268 UCSB announcement at this link]. |
||
− | |||
− | See the full policies at '''[[COVID-19_User_Policies]]''' |
||
⚫ | |||
− | |||
⚫ | |||
− | Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows: |
||
− | |||
− | Industrial Users: $405/hour |
||
− | |||
− | UC Academic Users: $126/hour |
||
− | |||
− | Non-UC Academic Users: $150/hour |
||
− | |||
− | UCSB CNSI Incubator USers: $260/hour |
||
− | |||
− | //[[User:Thibeault|Thibeault]] 12:21, 9 December 2021 (PST) |
||
<!---------- end of Equipment Status ------------> |
<!---------- end of Equipment Status ------------> |
||
Line 69: | Line 44: | ||
− | ====== HOW TO ADD |
+ | ====== HOW TO ADD ITEMS ====== |
* You can copy/paste the example below for a new news item. |
* You can copy/paste the example below for a new news item. |
Revision as of 17:47, 28 November 2022
Important Announcements
MA6: service 11/30
The MA6 will be unavailable on Wednesday 11/30 beginning around 7:15 am until around 5 pm. We'll send out an email that day once the service is completed. // John d 08:26, 20 November 2022 (PST)
ASML: Down on Dec 12th
On Dec 12th the system will be down for half a day, so we can perform periodic maintenance (PM) on the DUV Laser. // John d 16:47, 28 November 2022 (PST)
Au Plating: DOWN
Bath damaged, system is down for repair. // John d 08:48, 27 October 2022 (PDT)
E-Beam#2: Heater Down
EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)
NanoFab Job Openings
The NanoFab has current job openings, apply at: NanoFab Job Postings
// John d 23:55, 4 October 2022 (PDT)