Difference between revisions of "Template:Announcements"
Jump to navigation
Jump to search
Line 17: | Line 17: | ||
[[User:Silva|Silva]] 10:20, 4 February 2019 (PST) |
[[User:Silva|Silva]] 10:20, 4 February 2019 (PST) |
||
− | ===== ALD Metal Dep. |
+ | ===== ALD Metal Dep. ===== |
The system is down. A new turbo pump will be delivered in three weeks. |
The system is down. A new turbo pump will be delivered in three weeks. |
||
[[User:Silva|Silva]] 10:41, 4 February 2019 (PST) |
[[User:Silva|Silva]] 10:41, 4 February 2019 (PST) |
Revision as of 11:42, 4 February 2019
Equipment Status
Suss Bonder
The system is down. We are waiting for fieldservce. Silva 10:18, 4 February 2019 (PST)
KLA Tencor Surfscan
The system is down. We are sourcing a replacement PCB. Silva 10:20, 4 February 2019 (PST)
ALD Metal Dep.
The system is down. A new turbo pump will be delivered in three weeks. Silva 10:41, 4 February 2019 (PST)