Difference between revisions of "Template:Announcements"
Jump to navigation
Jump to search
(jeol update) |
(removed ICP#1) |
||
Line 17: | Line 17: | ||
// [[User:John d|Posted: ]] 09:58, 4 January 2018 (PST) |
// [[User:John d|Posted: ]] 09:58, 4 January 2018 (PST) |
||
− | ===== ICP#1: Up ===== |
||
− | He cooling fixed. |
||
− | // [[User:John d|Posted:]] 01:32, 15 February 2018 (PST) |
||
===== JEOL SEM #2: Up Overnight ===== |
===== JEOL SEM #2: Up Overnight ===== |
Revision as of 08:37, 21 February 2018
UCSB NanoFab Announcements
Announcements
There are no general announcements at this time. // Posted: 09:58, 4 January 2018 (PST)
JEOL SEM #2: Up Overnight
System up for use tonight only (2018-02-20). JEOL service returning on Wed for permanent fix, system will be down on Wed. // Posted: 17:35, 20 February 2018 (PST)
Gasonics: Up
The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to be repaired and returned. // Posted: 10:14, 12 February 2018 (PST)
Cary 500 Down
UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options. // Posted: 13:47, 12 February 2018 (PST)