Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
m (remove spaces)
(gasonics up, mech. pump notice)
Line 17: Line 17:
 
// [[User:John d|Posted: ]] 09:58, 4 January 2018 (PST)
 
// [[User:John d|Posted: ]] 09:58, 4 January 2018 (PST)
   
===== Gasonics Down =====
+
===== Gasonics Up =====
  +
The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to repaired and returned.
Check email for updates.
 
 
// [[User:John d|Posted:]] 10:14, 12 February 2018 (PST)
 
// [[User:John d|Posted:]] 10:14, 12 February 2018 (PST)
   

Revision as of 14:46, 12 February 2018

UCSB NanoFab Announcements

Announcements

There are no general announcements at this time. // Posted: 09:58, 4 January 2018 (PST)

Gasonics Up

The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to repaired and returned. // Posted: 10:14, 12 February 2018 (PST)

ASML Up

ASML Stepper #3 periodic maintenance is complete. System is ready for use. // Posted: 18:52, 10 February 2018 (PST)

JEOL SEM #2

Problem with load lock gate valve. Currently down. // Posted: 15:40, 8 February 2018 (PST)

Cary 500

UV-Vis Detector Failure. Tool is able to used from 600nm and up. Locating replacement PMT detector. // Posted: 15:06, 7 December 2017 (PST)