Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
=====IBD Down =====
+
=====IBD UP=====
  +
We received the new Xe bottle, and it was installed, leak checked, and tested without issue.
We are still working to source a new Xenon supplier. We'll update you once we know more.
 
  +
IBD is back up and available for use.
//[[User:Mehalana v|Vraj Mehalana]] 14:51, 9 May 2023 (PDT)
 
  +
I apologize for any inconvenience.
 
 
//[[User:Mehalana v|Vraj Mehalana]] 12:20, 25 May 2023 (PDT)
 
=====Plasma Activation (EVG 810)=====
 
=====Plasma Activation (EVG 810)=====
 
We have received almost all the replacement parts for the tool except the new chuck. The original delivery date of mid June has now been pushed out to early September and they have stated that this is the best that their supplier can do. I will not be installing any new parts on the tool until we have everything.
 
We have received almost all the replacement parts for the tool except the new chuck. The original delivery date of mid June has now been pushed out to early September and they have stated that this is the best that their supplier can do. I will not be installing any new parts on the tool until we have everything.

Revision as of 12:20, 25 May 2023

IBD UP

We received the new Xe bottle, and it was installed, leak checked, and tested without issue. IBD is back up and available for use. I apologize for any inconvenience. //Vraj Mehalana 12:20, 25 May 2023 (PDT)

Plasma Activation (EVG 810)

We have received almost all the replacement parts for the tool except the new chuck. The original delivery date of mid June has now been pushed out to early September and they have stated that this is the best that their supplier can do. I will not be installing any new parts on the tool until we have everything. Runs will still require Staff supervision until then. //Vraj Mehalana 18:01, 2 May 2023 (PDT)