===== EBeam4 is up=====
  +
EBeam4 is back up.
   
  +
The overnight regen of the cryo was completed this morning.
=====Job Opening: Process Engineer=====
 
  +
I then tested the operation of the hoist numerous times without issue.
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
 
  +
I tested the EBeam by running 200A of Ti without issue.
//[[User:Mehalana v|Vraj Mehalana]] 14:52, 30 October 2023 (PDT)
 
   
  +
System UP
=====EBeam2 UP=====
 
Test run completed without issue. System is ready to use, EXCEPT for heater - contact supervisor for heater use. See email for updates to operating procedure.
 
   
//[[User:Mehalana v|Vraj Mehalana]] 11:48, 26 October 2023 (PDT)
+
//10:36, 30 May 2024 (PDT)
=====ProbeStation scheduled IT maintenance=====
 
The probe station is up, only the computer is down. Standard electrical probe measurements are still available, just not automated plotting
 
//[[User:Mehalana v|Vraj Mehalana]] 14:29, 3 November 2023 (PDT)
 
   
=====PECVD2 is down=====
+
=====Stepper #1 (GCA 6300) - Tool availability=====
  +
Stepper #1 (6300) will be undergoing maintenance and be unavailable the following dates and times:
We were able to fix the vacuum leak but unfortunately the particulates are off the chart and rate is still a bit low. Tomorrow morning we will be taking the showerhead apart and cleaning it up before testing again.
 
//[[User:Mehalana v|Vraj Mehalana]] 16:48, 31 October 2023 (PDT)
 
   
  +
6-18-24 at 8:00am
=====Unaxis VLR - GapFill allowed Mon 30th 5pm to Wed 6am=====
 
  +
Till
We are still working on an improved GapFill recipe.
 
  +
6-20-24 at 5:00pm
   
  +
Please plan your processing activities accordingly.
To allow your processes through, on Monday EVENING at 5pm we will allow the old "450W GapFill" recipe to be run,
 
  +
//13:32, 1 June 2024 (PDT)
   
  +
=====Stepper #2 (GCA Autostep 200) - Tool availability=====
- starting Monday Oct 30th, evening at 5pm,
 
  +
Stepper #2 (AutoStep 200) will be undergoing maintenance and be unavailable the following dates and times:
   
  +
6-21-24 at 8:00am
- ending Wed Nov 1st, morning at 6am.
 
  +
Till
  +
6-21-24 at 5:00pm
   
  +
Please plan your processing activities accordingly.
Reminder: You may NOT run the 450W recipe outside these allowed times, and you may Not modify our recipes apart from Dep/Clean TIME.
 
   
  +
Thanks
Let me know if you have any questions.
 
  +
Bill Millerski
  +
UCSB
  +
//13:32, 1 June 2024 (PDT)
   
  +
=====Stepper #3 (ASML DUV) - System UP and calibrated=====
//[[User:Mehalana v|Vraj Mehalana]] 09:55, 11 October 2023 (PDT)
 
  +
We have finished calibrations,
  +
System is up.
   
  +
Reminder to check/recalibrate your exposure dose. Focus should be the same, but beam optics changeout will affect dose.
=====Wafer Bonder, (Suss SB6-8E)=====
 
 
//[[User:Mehalana v|Vraj Mehalana]] 11:17, 24 May 2024 (PDT)
The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update.
 
   
  +
=====Unaxis VLR still Down=====
//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT)
 
   
  +
The chiller has a decent sized ball of ice inside of it.
=====EVG Activation: Up=====
 
The FSE has completed the work on the tool and I have made several test runs without issue.
 
   
  +
I need to let that melt off before I can do a proper diagnosis of what is causing the high pressure cut off to trip when the refrigerant pressures seem normal.
IMPORTANT - Please see corresponding email for changes in operation.
 
  +
//13:29, 1 June 2024 (PDT)
  +
 
//[[User:Mehalana v|Vraj Mehalana]] 11:17, 24 May 2024 (PDT)
  +
  +
=====Atomic Force Microscope (Dimension ICON) - 05/17: System UP=====
  +
Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder!
  +
 
//[[User:Mehalana v|Vraj Mehalana]] 13:46, 20 May 2024 (PDT)
  +
  +
=====MA6 TSA is down - Update=====
  +
Due to unforeseen circumstances our FSE will not be onsite next week to work on the TSA microscope. They have rescheduled with us for Thursday of the following week, 6/13. I apologize for the inconvenience.
  +
  +
Per my previous email, there is a MA6 available for use at CNSI. Here is a link to the webpage for their tools:
  +
  +
https://www.cnsi.ucsb.edu/facilities/quantum-structures/nanofabrication
  +
  +
-Lee
  +
//15:59, 22 May 2024 (PDT)
  +
  +
=====Velion FIB Tool DOWN=====
  +
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
  +
 
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT)
  +
 
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
  +
  +
=====Lab Access Changes: Symmetry App=====
  +
The iris scanner has been decommissioned. Please use the card reader which supports:
  +
  +
-Physical card
  +
  +
-Mobile phone via Symmetry App
  +
  +
//10:54, 23 May 2024 (PDT)
  +
 
=====Wafer Bonder, (Suss SB6-8E)=====
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
   
//[[User:Mehalana v|Vraj Mehalana]] 15:58, 24 October 2023 (PDT)
 
 
<!--
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
Line 49: Line 94:
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
 
 
<!---------- end of Equipment Status ------------>
 
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<endfeed />

Latest revision as of 13:32, 1 June 2024

EBeam4 is up

EBeam4 is back up.

The overnight regen of the cryo was completed this morning. I then tested the operation of the hoist numerous times without issue. I tested the EBeam by running 200A of Ti without issue.

System UP

//10:36, 30 May 2024 (PDT)

Stepper #1 (GCA 6300) - Tool availability

Stepper #1 (6300) will be undergoing maintenance and be unavailable the following dates and times:

6-18-24 at 8:00am Till 6-20-24 at 5:00pm

Please plan your processing activities accordingly. //13:32, 1 June 2024 (PDT)

Stepper #2 (GCA Autostep 200) - Tool availability

Stepper #2 (AutoStep 200) will be undergoing maintenance and be unavailable the following dates and times:

6-21-24 at 8:00am Till 6-21-24 at 5:00pm

Please plan your processing activities accordingly.

Thanks Bill Millerski UCSB //13:32, 1 June 2024 (PDT)

Stepper #3 (ASML DUV) - System UP and calibrated

We have finished calibrations, System is up.

Reminder to check/recalibrate your exposure dose. Focus should be the same, but beam optics changeout will affect dose. //Vraj Mehalana 11:17, 24 May 2024 (PDT)

Unaxis VLR still Down

The chiller has a decent sized ball of ice inside of it.

I need to let that melt off before I can do a proper diagnosis of what is causing the high pressure cut off to trip when the refrigerant pressures seem normal. //13:29, 1 June 2024 (PDT)

//Vraj Mehalana 11:17, 24 May 2024 (PDT)

Atomic Force Microscope (Dimension ICON) - 05/17: System UP

Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder!

//Vraj Mehalana 13:46, 20 May 2024 (PDT)

MA6 TSA is down - Update

Due to unforeseen circumstances our FSE will not be onsite next week to work on the TSA microscope. They have rescheduled with us for Thursday of the following week, 6/13. I apologize for the inconvenience.

Per my previous email, there is a MA6 available for use at CNSI. Here is a link to the webpage for their tools:

https://www.cnsi.ucsb.edu/facilities/quantum-structures/nanofabrication

-Lee //15:59, 22 May 2024 (PDT)

Velion FIB Tool DOWN

Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.

//Vraj Mehalana 10:58, 30 April 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//10:54, 23 May 2024 (PDT)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)