Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(LN2 closure)
 
(220 intermediate revisions by 7 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
  +
=====Stepper #3 (ASML DUV) - System UP and calibrated=====
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
  +
We have finished calibrations,
<!-- Description of the RSS feed -->
 
  +
System is up.
'''''Important Announcements'''''
 
----
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
   
  +
Reminder to check/recalibrate your exposure dose. Focus should be the same, but beam optics changeout will affect dose.
In order for your post to show up correctly, you need to:
 
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
   
  +
//11:17, 24 May 2024 (PDT)
===== Nanofab CLOSED @ 8pm, Jan 10th =====
 
The highway closure has prevented our LN2 vendor from making our delivery. This situation had dictated the necessity to close the lab tonight at 8pm.
 
   
  +
=====Atomic Force Microscope (Dimension ICON) - 05/17: System UP=====
Sorry for the short notice and any inconvenience this might have caused. We will send out an update once we know more details on delivery times and when the lab will reopen. 
 
  +
Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder!
   
// [[User:John d|John d]] 15:28, 10 January 2023 (PST)
+
//[[User:Mehalana v|Vraj Mehalana]] 13:46, 20 May 2024 (PDT)
   
===== Au Plating: DOWN =====
+
=====MA6 TSA is down - Update=====
  +
We have received the replacement motor for the TSA Y axis. The FSE will be onsite Monday June 3rd to work on the tool.
Bath damaged, system is down for repair.
 
// [[User:John d|John d]] 08:48, 27 October 2022 (PDT)
 
   
  +
The tool remains up for backside alignment and topside exposures that do not require alignment.
<!---------- end of Equipment Status ------------>
 
<!---------------------------------------------->
 
<endfeed />
 
<noinclude>[[Category:Templates]]</noinclude>
 
<!--------------------------------------------
 
   
  +
-Lee
  +
//15:59, 22 May 2024 (PDT)
   
  +
=====Velion FIB Tool DOWN=====
  +
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
   
  +
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT)
   
  +
=====Stepper #3 (ASML DUV) - Pneumatics repaired, extra day for optics=====
====== HOW TO ADD ITEMS ======
 
  +
We were able to repair the pneumatics issue and are currently running reticle and wafer reproducability runs overnight to exercise/test the system.
   
  +
Consequently the optics was only started today, so will take one day longer than planned - we will extend this visit to Thursday to complete the work.
  +
  +
Sorry for the inconvenience.
  +
  +
//[[User:Mehalana v|Vraj Mehalana]] 19:04, 21 May 2024 (PDT)
  +
  +
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
  +
  +
=====Lab Access Changes: Symmetry App=====
  +
The iris scanner has been decommissioned. Please use the card reader which supports:
  +
  +
-Physical card
  +
  +
-Mobile phone via Symmetry App
  +
  +
//10:54, 23 May 2024 (PDT)
  +
  +
=====Wafer Bonder, (Suss SB6-8E)=====
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
  +
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
In order for your post to show up correctly, you need to:
 
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<noinclude>[[Category:Templates]]</noinclude>
 
<!--------------------------------------------
 
====== HOW TO ADD ITEMS ======
 
* You can copy/paste the example below for a new news item.
 
* You can copy/paste the example below for a new news item.
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
* You must add a user signature at the end of each post via four tildes: ~~~~. Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
+
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
Line 51: Line 78:
 
===== NanoFab making LN2 icecream =====
 
===== NanoFab making LN2 icecream =====
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
  +
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST)
// ~~~~
 
   
 
************* (end of example) **************
 
************* (end of example) **************
The ~~~~ will be replaced with your username & timestamp after you submit the post.
+
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post.
 
---------------------------------------------->
 
---------------------------------------------->

Latest revision as of 11:17, 24 May 2024

Stepper #3 (ASML DUV) - System UP and calibrated

We have finished calibrations, System is up.

Reminder to check/recalibrate your exposure dose. Focus should be the same, but beam optics changeout will affect dose.

//11:17, 24 May 2024 (PDT)

Atomic Force Microscope (Dimension ICON) - 05/17: System UP

Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder!

//Vraj Mehalana 13:46, 20 May 2024 (PDT)

MA6 TSA is down - Update

We have received the replacement motor for the TSA Y axis. The FSE will be onsite Monday June 3rd to work on the tool.

The tool remains up for backside alignment and topside exposures that do not require alignment.

-Lee //15:59, 22 May 2024 (PDT)

Velion FIB Tool DOWN

Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.

//Vraj Mehalana 10:58, 30 April 2024 (PDT)

Stepper #3 (ASML DUV) - Pneumatics repaired, extra day for optics

We were able to repair the pneumatics issue and are currently running reticle and wafer reproducability runs overnight to exercise/test the system.

Consequently the optics was only started today, so will take one day longer than planned - we will extend this visit to Thursday to complete the work.

Sorry for the inconvenience.

//Vraj Mehalana 19:04, 21 May 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//10:54, 23 May 2024 (PDT)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)