Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(Updated that tools are up but gas is down)
 
(278 intermediate revisions by 7 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
  +
=====EBeam4 Update - Still down=====
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
  +
EBeam4 will remain down overnight.
<!-- Description of the RSS feed -->
 
'''''Important Announcements'''''
 
----
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
   
  +
The new motor arrived as well as the new junction box and new cables.
In order for your post to show up correctly, you need to:
 
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
   
  +
I removed the old junction box/plugs due to a lot of corrosion inside the box caused by it being located directly under the water supply lines.
===== All Chlorine gasses disabled =====
 
There is a leak in our Cl2 gas cabinet that we are currently addressing.
 
   
  +
This corrosion inside the box could have contributed to the failure of the old motor.
All Cl2 processes will be down until we have finished replacing the necessary lines/fittings. Cl2 gas will most likely be down all day tomorrow and part of Tuesday. We will have a better estimate once we break open the lines.
 
   
  +
I installed the new motor, ran all new cables to the new junction box in it's new location away from the water lines.
Most tool running Cl2 are up, but you may NOT run any Cl2 gas on these machines until the lines have been repaired.
 
   
  +
I was able to test the function of the hoist by raising and lowering the bell jar while in manual mode.
An email will go out once we have an update.
 
// [[User:John d|John d]] 12:47, 28 August 2022 (PDT)
 
   
  +
For safety reasons, I had the machine powered off during the duration of the work being done, so the cryo will be in regen overnight.
===== ASML Up; Network status =====
 
   
  +
Tomorrow morning I will continue testing the system to ensure everything is working properly before I release the tool.
We are running a newer computer;
 
Nanofiles sync & JobCreator functionality will be restored in the next few weeks.
 
   
  +
I will send another email when an update is available.
// [[User:John d|John d]] 09:00, 22 July 2022 (PDT)
 
   
  +
//10:36, 30 May 2024 (PDT)
===== Face-Masks Optional as of June 13 =====
 
You are not required to wear a mask in UC buildings at this time. You are also not required to wear a mask in the Nanofab if desired.
 
   
  +
=====Stepper #3 (ASML DUV) - System UP and calibrated=====
We will still provide masks at the metal table in front of the cleanroom entry.
 
  +
We have finished calibrations,
See the [https://t.e2ma.net/webview/be2nag/25634e9f535619ce1f4eb976598e7268 UCSB announcement at this link].
 
  +
System is up.
   
  +
Reminder to check/recalibrate your exposure dose. Focus should be the same, but beam optics changeout will affect dose.
See the full policies at '''[[COVID-19_User_Policies]]'''
 
// [[User:John d|John d]] 11:20, 13 June 2022 (PDT)
 
   
 
//[[User:Mehalana v|Vraj Mehalana]] 11:17, 24 May 2024 (PDT)
===== New EBL Rates =====
 
Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows:
 
   
  +
=====Atomic Force Microscope (Dimension ICON) - 05/17: System UP=====
Industrial Users: $405/hour
 
  +
Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder!
   
 
//[[User:Mehalana v|Vraj Mehalana]] 13:46, 20 May 2024 (PDT)
UC Academic Users: $126/hour
 
   
  +
=====MA6 TSA is down - Update=====
Non-UC Academic Users: $150/hour
 
  +
We have received the replacement motor for the TSA Y axis. The FSE will be onsite Monday June 3rd to work on the tool.
   
  +
The tool remains up for backside alignment and topside exposures that do not require alignment.
UCSB CNSI Incubator USers: $260/hour
 
   
  +
-Lee
//[[User:Thibeault|Thibeault]] 12:21, 9 December 2021 (PST)
 
  +
//15:59, 22 May 2024 (PDT)
   
  +
=====Velion FIB Tool DOWN=====
<!---------- end of Equipment Status ------------>
 
  +
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
<!---------------------------------------------->
 
<endfeed />
 
<noinclude>[[Category:Templates]]</noinclude>
 
<!--------------------------------------------
 
   
  +
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT)
   
  +
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
   
  +
=====Lab Access Changes: Symmetry App=====
  +
The iris scanner has been decommissioned. Please use the card reader which supports:
   
  +
-Physical card
====== HOW TO ADD NEWS ITEMS ======
 
   
  +
-Mobile phone via Symmetry App
  +
  +
//10:54, 23 May 2024 (PDT)
  +
  +
=====Wafer Bonder, (Suss SB6-8E)=====
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
  +
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
In order for your post to show up correctly, you need to:
 
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<noinclude>[[Category:Templates]]</noinclude>
 
<!--------------------------------------------
 
====== HOW TO ADD ITEMS ======
 
* You can copy/paste the example below for a new news item.
 
* You can copy/paste the example below for a new news item.
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
* You must add a user signature at the end of each post via four tildes: ~~~~. Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
+
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
Line 79: Line 90:
 
===== NanoFab making LN2 icecream =====
 
===== NanoFab making LN2 icecream =====
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
  +
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST)
// ~~~~
 
   
 
************* (end of example) **************
 
************* (end of example) **************
The ~~~~ will be replaced with your username & timestamp after you submit the post.
+
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post.
 
---------------------------------------------->
 
---------------------------------------------->

Latest revision as of 10:36, 30 May 2024

EBeam4 Update - Still down

EBeam4 will remain down overnight.

The new motor arrived as well as the new junction box and new cables.

I removed the old junction box/plugs due to a lot of corrosion inside the box caused by it being located directly under the water supply lines.

This corrosion inside the box could have contributed to the failure of the old motor.

I installed the new motor, ran all new cables to the new junction box in it's new location away from the water lines.

I was able to test the function of the hoist by raising and lowering the bell jar while in manual mode.

For safety reasons, I had the machine powered off during the duration of the work being done, so the cryo will be in regen overnight.

Tomorrow morning I will continue testing the system to ensure everything is working properly before I release the tool.

I will send another email when an update is available.

//10:36, 30 May 2024 (PDT)

Stepper #3 (ASML DUV) - System UP and calibrated

We have finished calibrations, System is up.

Reminder to check/recalibrate your exposure dose. Focus should be the same, but beam optics changeout will affect dose.

//Vraj Mehalana 11:17, 24 May 2024 (PDT)

Atomic Force Microscope (Dimension ICON) - 05/17: System UP

Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder!

//Vraj Mehalana 13:46, 20 May 2024 (PDT)

MA6 TSA is down - Update

We have received the replacement motor for the TSA Y axis. The FSE will be onsite Monday June 3rd to work on the tool.

The tool remains up for backside alignment and topside exposures that do not require alignment.

-Lee //15:59, 22 May 2024 (PDT)

Velion FIB Tool DOWN

Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.

//Vraj Mehalana 10:58, 30 April 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//10:54, 23 May 2024 (PDT)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)