Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(unaxis-dep up)
 
(294 intermediate revisions by 7 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
  +
===== EBeam4 is up=====
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
  +
EBeam4 is back up.
<!-- Description of the RSS feed -->
 
'''''Important Announcements'''''
 
----
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
   
  +
The overnight regen of the cryo was completed this morning.
In order for your post to show up correctly, you need to:
 
  +
I then tested the operation of the hoist numerous times without issue.
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
 
  +
I tested the EBeam by running 200A of Ti without issue.
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
   
  +
System UP
===== Unaxis-Dep: Up =====
 
New bottle of Deuterated Silane (SiD4) has been installed, we've qualified the SiO2 process and it looks good. Films are ready to use.
 
// [[User:John d|John d]] 10:11, 17 June 2022 (PDT)
 
   
  +
//10:36, 30 May 2024 (PDT)
===== ASML Down =====
 
All hardware replacements are scheduled to arrive today, and ASML engineers will be on-site next week to get the system back up.
 
   
  +
=====Stepper #1 (GCA 6300) - Tool availability=====
We will likely be installing a new computer on the system next week. We have all user jobs backed up, so no user data will be lost in the transfer. However, the sync scripts for python ASML-JobCreator scripting will need to be re-written, so the automatic syncing for JobCreator will be unavailable until I rewrite those.
 
  +
Stepper #1 (6300) will be undergoing maintenance and be unavailable the following dates and times:
// [[User:John d|John d]] 10:01, 17 June 2022 (PDT)
 
   
  +
6-18-24 at 8:00am
===== Masks Optional as of June 13 =====
 
  +
Till
You are not required to wear a mask in UC buildings at this time. You are also not required to wear a mask in the Nanofab if desired.
 
  +
6-20-24 at 5:00pm
   
  +
Please plan your processing activities accordingly.
We will still provide masks at the metal table in front of the cleanroom entry.
 
  +
//13:32, 1 June 2024 (PDT)
See the [https://t.e2ma.net/webview/be2nag/25634e9f535619ce1f4eb976598e7268 UCSB announcement at this link].
 
   
  +
=====Stepper #2 (GCA Autostep 200) - Tool availability=====
See the full policies at '''[[COVID-19_User_Policies]]'''
 
  +
Stepper #2 (AutoStep 200) will be undergoing maintenance and be unavailable the following dates and times:
// [[User:John d|John d]] 11:20, 13 June 2022 (PDT)
 
   
  +
6-21-24 at 8:00am
===== PureStrip Bath Heater DOWN =====
 
  +
Till
The temperature controller on the PureStrip vertical bath in Bay 4 acid bench has failed, do not attempt to use until we replace it.
 
  +
6-21-24 at 5:00pm
// [[User:John d|John d]] 16:09, 10 June 2022 (PDT)
 
   
  +
Please plan your processing activities accordingly.
===== Gasonics Down =====
 
Leak in main chamber, tool is down.
 
// [[User:John d|John d]] 14:35, 27 May 2022 (PDT)
 
   
  +
Thanks
===== New EBL Rates =====
 
  +
Bill Millerski
Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows:
 
  +
UCSB
  +
//13:32, 1 June 2024 (PDT)
   
  +
=====Stepper #3 (ASML DUV) - System UP and calibrated=====
Industrial Users: $405/hour
 
  +
We have finished calibrations,
  +
System is up.
   
  +
Reminder to check/recalibrate your exposure dose. Focus should be the same, but beam optics changeout will affect dose.
UC Academic Users: $126/hour
 
  +
//[[User:Mehalana v|Vraj Mehalana]] 11:17, 24 May 2024 (PDT)
   
  +
=====Unaxis VLR still Down=====
Non-UC Academic Users: $150/hour
 
   
  +
The chiller has a decent sized ball of ice inside of it.
UCSB CNSI Incubator USers: $260/hour
 
   
  +
I need to let that melt off before I can do a proper diagnosis of what is causing the high pressure cut off to trip when the refrigerant pressures seem normal.
//[[User:Thibeault|Thibeault]] 12:21, 9 December 2021 (PST)
 
  +
//13:29, 1 June 2024 (PDT)
   
  +
//[[User:Mehalana v|Vraj Mehalana]] 11:17, 24 May 2024 (PDT)
<!---------- end of Equipment Status ------------>
 
<!---------------------------------------------->
 
<endfeed />
 
<noinclude>[[Category:Templates]]</noinclude>
 
<!--------------------------------------------
 
   
  +
=====Atomic Force Microscope (Dimension ICON) - 05/17: System UP=====
  +
Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder!
   
  +
//[[User:Mehalana v|Vraj Mehalana]] 13:46, 20 May 2024 (PDT)
   
  +
=====MA6 TSA is down - Update=====
  +
Due to unforeseen circumstances our FSE will not be onsite next week to work on the TSA microscope. They have rescheduled with us for Thursday of the following week, 6/13. I apologize for the inconvenience.
   
  +
Per my previous email, there is a MA6 available for use at CNSI. Here is a link to the webpage for their tools:
====== HOW TO ADD NEWS ITEMS ======
 
   
  +
https://www.cnsi.ucsb.edu/facilities/quantum-structures/nanofabrication
  +
  +
-Lee
  +
//15:59, 22 May 2024 (PDT)
  +
  +
=====Velion FIB Tool DOWN=====
  +
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
  +
  +
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT)
  +
  +
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
  +
  +
=====Lab Access Changes: Symmetry App=====
  +
The iris scanner has been decommissioned. Please use the card reader which supports:
  +
  +
-Physical card
  +
  +
-Mobile phone via Symmetry App
  +
  +
//10:54, 23 May 2024 (PDT)
  +
  +
=====Wafer Bonder, (Suss SB6-8E)=====
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
  +
  +
<!--
  +
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
  +
In order for your post to show up correctly, you need to:
  +
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
  +
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
  +
-->
  +
<!---------DO NOT EDIT BELOW THIS LINE----------->
  +
<endfeed />
  +
<noinclude>[[Category:Templates]]</noinclude>
  +
<!--------------------------------------------
  +
====== HOW TO ADD ITEMS ======
 
* You can copy/paste the example below for a new news item.
 
* You can copy/paste the example below for a new news item.
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
* You must add a user signature at the end of each post via four tildes: ~~~~. Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
+
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
Line 80: Line 114:
 
===== NanoFab making LN2 icecream =====
 
===== NanoFab making LN2 icecream =====
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
  +
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST)
// ~~~~
 
   
 
************* (end of example) **************
 
************* (end of example) **************
The ~~~~ will be replaced with your username & timestamp after you submit the post.
+
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post.
 
---------------------------------------------->
 
---------------------------------------------->

Latest revision as of 13:32, 1 June 2024

EBeam4 is up

EBeam4 is back up.

The overnight regen of the cryo was completed this morning. I then tested the operation of the hoist numerous times without issue. I tested the EBeam by running 200A of Ti without issue.

System UP

//10:36, 30 May 2024 (PDT)

Stepper #1 (GCA 6300) - Tool availability

Stepper #1 (6300) will be undergoing maintenance and be unavailable the following dates and times:

6-18-24 at 8:00am Till 6-20-24 at 5:00pm

Please plan your processing activities accordingly. //13:32, 1 June 2024 (PDT)

Stepper #2 (GCA Autostep 200) - Tool availability

Stepper #2 (AutoStep 200) will be undergoing maintenance and be unavailable the following dates and times:

6-21-24 at 8:00am Till 6-21-24 at 5:00pm

Please plan your processing activities accordingly.

Thanks Bill Millerski UCSB //13:32, 1 June 2024 (PDT)

Stepper #3 (ASML DUV) - System UP and calibrated

We have finished calibrations, System is up.

Reminder to check/recalibrate your exposure dose. Focus should be the same, but beam optics changeout will affect dose. //Vraj Mehalana 11:17, 24 May 2024 (PDT)

Unaxis VLR still Down

The chiller has a decent sized ball of ice inside of it.

I need to let that melt off before I can do a proper diagnosis of what is causing the high pressure cut off to trip when the refrigerant pressures seem normal. //13:29, 1 June 2024 (PDT)

//Vraj Mehalana 11:17, 24 May 2024 (PDT)

Atomic Force Microscope (Dimension ICON) - 05/17: System UP

Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder!

//Vraj Mehalana 13:46, 20 May 2024 (PDT)

MA6 TSA is down - Update

Due to unforeseen circumstances our FSE will not be onsite next week to work on the TSA microscope. They have rescheduled with us for Thursday of the following week, 6/13. I apologize for the inconvenience.

Per my previous email, there is a MA6 available for use at CNSI. Here is a link to the webpage for their tools:

https://www.cnsi.ucsb.edu/facilities/quantum-structures/nanofabrication

-Lee //15:59, 22 May 2024 (PDT)

Velion FIB Tool DOWN

Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.

//Vraj Mehalana 10:58, 30 April 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//10:54, 23 May 2024 (PDT)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)