Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(CR closure June 1, 6-9am)
 
(313 intermediate revisions by 7 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
  +
===== EBeam4 is up=====
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
  +
EBeam4 is back up.
<!-- Description of the RSS feed -->
 
'''''Important Announcements'''''
 
----
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
   
  +
The overnight regen of the cryo was completed this morning.
In order for your post to show up correctly, you need to:
 
  +
I then tested the operation of the hoist numerous times without issue.
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
 
  +
I tested the EBeam by running 200A of Ti without issue.
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
   
  +
System UP
===== NanoFab CLOSED: Wed June 1, 6-9am =====
 
'''The cleanroom will be closed to users from 6am to 9am on Wed June 1st,''' to allow Campus facilities to perform yearly emergency generator testing.
 
   
  +
//10:36, 30 May 2024 (PDT)
We will send out an email once the lab is safe to enter.
 
   
  +
=====Stepper #1 (GCA 6300) - Tool availability=====
Please plan accordingly.
 
  +
Stepper #1 (6300) will be undergoing maintenance and be unavailable the following dates and times:
// [[User:John d|John d]] 12:14, 24 May 2022 (PDT)
 
   
  +
6-18-24 at 8:00am
===== AFM: UP =====
 
  +
Till
[[Atomic_Force_Microscope_(Bruker_ICON)|AFM]] head repaired. If you find that a pin is bent, or off axis, then STOP and immediately contact [[Bill Mitchell]]. Under no circumstances should you try to fix yourself.
 
  +
6-20-24 at 5:00pm
// [[User:John d|John d]] 21:12, 19 May 2022 (PDT)
 
   
  +
Please plan your processing activities accordingly.
===== F50 UP =====
 
  +
//13:32, 1 June 2024 (PDT)
The [[Optical_Film_Thickness_%26_Wafer-Mapping_(Filmetrics_F50)|Filmetrics F50 Wafer Mapper]] is repaired and up.
 
   
  +
=====Stepper #2 (GCA Autostep 200) - Tool availability=====
Tool has been relocated to Bay 7, just before the EBL room.
 
  +
Stepper #2 (AutoStep 200) will be undergoing maintenance and be unavailable the following dates and times:
// [[User:John d|John d]] 07:24, 10 May 2022 (PDT)
 
   
  +
6-21-24 at 8:00am
===== New COVID protocols =====
 
  +
Till
Please read the linked letter below (on Wiki) regarding masking policy changes, effective Saturday, March 19.
 
  +
6-21-24 at 5:00pm
   
  +
Please plan your processing activities accordingly.
The nanofab will follow this policy with masks being optional for everyone in all sections of the facility beginning March 19.
 
   
  +
Thanks
All users must adhere to the campus policies as outlined in the letter from Chancellor Yang, including testing where required.
 
  +
Bill Millerski
  +
UCSB
  +
//13:32, 1 June 2024 (PDT)
   
  +
=====Stepper #3 (ASML DUV) - System UP and calibrated=====
Link: [https://t.e2ma.net/message/opq87n/0equghb March 16th 2022- Letter from Office of the Chancellor]
 
  +
We have finished calibrations,
  +
System is up.
   
  +
Reminder to check/recalibrate your exposure dose. Focus should be the same, but beam optics changeout will affect dose.
See the full policies at '''[[COVID-19_User_Policies]]'''
 
// [[User:John d|John d]] 16:08, 21 March 2022 (PDT)
+
//[[User:Mehalana v|Vraj Mehalana]] 11:17, 24 May 2024 (PDT)
   
===== New EBL Rates =====
+
=====Unaxis VLR still Down=====
Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows:
 
   
  +
The chiller has a decent sized ball of ice inside of it.
Industrial Users: $405/hour
 
   
  +
I need to let that melt off before I can do a proper diagnosis of what is causing the high pressure cut off to trip when the refrigerant pressures seem normal.
UC Academic Users: $126/hour
 
  +
//13:29, 1 June 2024 (PDT)
   
  +
//[[User:Mehalana v|Vraj Mehalana]] 11:17, 24 May 2024 (PDT)
Non-UC Academic Users: $150/hour
 
   
  +
=====Atomic Force Microscope (Dimension ICON) - 05/17: System UP=====
UCSB CNSI Incubator USers: $260/hour
 
  +
Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder!
   
//[[User:Thibeault|Thibeault]] 12:21, 9 December 2021 (PST)
+
//[[User:Mehalana v|Vraj Mehalana]] 13:46, 20 May 2024 (PDT)
   
  +
=====MA6 TSA is down - Update=====
<!---------- end of Equipment Status ------------>
 
  +
Due to unforeseen circumstances our FSE will not be onsite next week to work on the TSA microscope. They have rescheduled with us for Thursday of the following week, 6/13. I apologize for the inconvenience.
<!---------------------------------------------->
 
<endfeed />
 
<noinclude>[[Category:Templates]]</noinclude>
 
<!--------------------------------------------
 
   
  +
Per my previous email, there is a MA6 available for use at CNSI. Here is a link to the webpage for their tools:
   
  +
https://www.cnsi.ucsb.edu/facilities/quantum-structures/nanofabrication
   
  +
-Lee
  +
//15:59, 22 May 2024 (PDT)
   
====== HOW TO ADD NEWS ITEMS ======
+
=====Velion FIB Tool DOWN=====
  +
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
   
  +
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT)
  +
  +
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
  +
  +
=====Lab Access Changes: Symmetry App=====
  +
The iris scanner has been decommissioned. Please use the card reader which supports:
  +
  +
-Physical card
  +
  +
-Mobile phone via Symmetry App
  +
  +
//10:54, 23 May 2024 (PDT)
  +
  +
=====Wafer Bonder, (Suss SB6-8E)=====
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
  +
  +
<!--
  +
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
  +
In order for your post to show up correctly, you need to:
  +
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
  +
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
  +
-->
  +
<!---------DO NOT EDIT BELOW THIS LINE----------->
  +
<endfeed />
  +
<noinclude>[[Category:Templates]]</noinclude>
  +
<!--------------------------------------------
  +
====== HOW TO ADD ITEMS ======
 
* You can copy/paste the example below for a new news item.
 
* You can copy/paste the example below for a new news item.
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
* You must add a user signature at the end of each post via four tildes: ~~~~. Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
+
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
Line 83: Line 114:
 
===== NanoFab making LN2 icecream =====
 
===== NanoFab making LN2 icecream =====
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
  +
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST)
// ~~~~
 
   
 
************* (end of example) **************
 
************* (end of example) **************
The ~~~~ will be replaced with your username & timestamp after you submit the post.
+
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post.
 
---------------------------------------------->
 
---------------------------------------------->

Latest revision as of 13:32, 1 June 2024

EBeam4 is up

EBeam4 is back up.

The overnight regen of the cryo was completed this morning. I then tested the operation of the hoist numerous times without issue. I tested the EBeam by running 200A of Ti without issue.

System UP

//10:36, 30 May 2024 (PDT)

Stepper #1 (GCA 6300) - Tool availability

Stepper #1 (6300) will be undergoing maintenance and be unavailable the following dates and times:

6-18-24 at 8:00am Till 6-20-24 at 5:00pm

Please plan your processing activities accordingly. //13:32, 1 June 2024 (PDT)

Stepper #2 (GCA Autostep 200) - Tool availability

Stepper #2 (AutoStep 200) will be undergoing maintenance and be unavailable the following dates and times:

6-21-24 at 8:00am Till 6-21-24 at 5:00pm

Please plan your processing activities accordingly.

Thanks Bill Millerski UCSB //13:32, 1 June 2024 (PDT)

Stepper #3 (ASML DUV) - System UP and calibrated

We have finished calibrations, System is up.

Reminder to check/recalibrate your exposure dose. Focus should be the same, but beam optics changeout will affect dose. //Vraj Mehalana 11:17, 24 May 2024 (PDT)

Unaxis VLR still Down

The chiller has a decent sized ball of ice inside of it.

I need to let that melt off before I can do a proper diagnosis of what is causing the high pressure cut off to trip when the refrigerant pressures seem normal. //13:29, 1 June 2024 (PDT)

//Vraj Mehalana 11:17, 24 May 2024 (PDT)

Atomic Force Microscope (Dimension ICON) - 05/17: System UP

Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder!

//Vraj Mehalana 13:46, 20 May 2024 (PDT)

MA6 TSA is down - Update

Due to unforeseen circumstances our FSE will not be onsite next week to work on the TSA microscope. They have rescheduled with us for Thursday of the following week, 6/13. I apologize for the inconvenience.

Per my previous email, there is a MA6 available for use at CNSI. Here is a link to the webpage for their tools:

https://www.cnsi.ucsb.edu/facilities/quantum-structures/nanofabrication

-Lee //15:59, 22 May 2024 (PDT)

Velion FIB Tool DOWN

Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.

//Vraj Mehalana 10:58, 30 April 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

The iris scanner has been decommissioned. Please use the card reader which supports:

-Physical card

-Mobile phone via Symmetry App

//10:54, 23 May 2024 (PDT)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)