=====Atomic Force Microscope (Dimension ICON) - 05/17: System UP=====
  +
Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder!
   
 
//[[User:Mehalana v|Vraj Mehalana]] 13:46, 20 May 2024 (PDT)
=====Job Opening: Process Engineer=====
 
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:52, 30 October 2023 (PDT)
 
   
=====EBeam2 UP=====
+
=====MA6 TSA is down - Update=====
  +
Multiple attempts to unbind the Y axis motor have been unsuccessful. The motor may have failed so I am waiting to hear back on Suss about availability and lead time.
Test run completed without issue. System is ready to use, EXCEPT for heater - contact supervisor for heater use. See email for updates to operating procedure.
 
   
  +
If you are in desperate need of using the tool with the topside microscope, CNSI's Quantum Structures Facility has one available for use:
//[[User:Mehalana v|Vraj Mehalana]] 11:48, 26 October 2023 (PDT)
 
=====ProbeStation scheduled IT maintenance=====
 
The ProbeStation will be undergoing IT maintenance and will be unavailable on the following dates :
 
* 10-30-23
 
* 10-31-23
 
* 11-01-23
 
* 11-02-23
 
Please plan your work activities accordingly.
 
   
  +
https://www.cnsi.ucsb.edu/facilities/quantum-structures/nanofabrication
//[[User:Mehalana v|Vraj Mehalana]] 14:52, 30 October 2023 (PDT)
 
   
  +
-Lee
=====PECVD2 is down=====
 
We were able to fix the vacuum leak but unfortunately the particulates are off the chart and rate is still a bit low. Tomorrow morning we will be taking the showerhead apart and cleaning it up before testing again.
 
//[[User:Mehalana v|Vraj Mehalana]] 16:48, 31 October 2023 (PDT)
 
   
 
//[[User:Mehalana v|Vraj Mehalana]] 14:41, 13 May 2024 (PDT)
=====Unaxis VLR - GapFill allowed Mon 30th 5pm to Wed 6am=====
 
We are still working on an improved GapFill recipe.
 
   
  +
=====Velion FIB Tool DOWN=====
To allow your processes through, on Monday EVENING at 5pm we will allow the old "450W GapFill" recipe to be run,
 
  +
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
   
  +
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT)
- starting Monday Oct 30th, evening at 5pm,
 
   
  +
=====ASML optics replacement May 20th-22nd=====
- ending Wed Nov 1st, morning at 6am.
 
  +
We will be performing beam delivery optics replacement on Mon May 20th to 22nd, to resolve a low intensity reading. The tool will be unavailable during this time.e.
   
 
//[[User:Mehalana v|Vraj Mehalana]] 09:40, 9 May 2024 (PDT)
Reminder: You may NOT run the 450W recipe outside these allowed times, and you may Not modify our recipes apart from Dep/Clean TIME.
 
   
 
=====ICP1 Down=====
Let me know if you have any questions.
 
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
   
  +
=====Lab Access Changes: Symmetry App=====
//[[User:Mehalana v|Vraj Mehalana]] 09:55, 11 October 2023 (PDT)
 
  +
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
  +
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
   
 
=====Wafer Bonder, (Suss SB6-8E)=====
 
=====Wafer Bonder, (Suss SB6-8E)=====
The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update.
+
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
   
//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT)
 
 
=====EVG Activation: Up=====
 
The FSE has completed the work on the tool and I have made several test runs without issue.
 
 
IMPORTANT - Please see corresponding email for changes in operation.
 
 
//[[User:Mehalana v|Vraj Mehalana]] 15:58, 24 October 2023 (PDT)
 
 
<!--
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
Line 55: Line 44:
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
 
 
<!---------- end of Equipment Status ------------>
 
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<endfeed />

Revision as of 13:46, 20 May 2024

Atomic Force Microscope (Dimension ICON) - 05/17: System UP

Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder!

//Vraj Mehalana 13:46, 20 May 2024 (PDT)

MA6 TSA is down - Update

Multiple attempts to unbind the Y axis motor have been unsuccessful. The motor may have failed so I am waiting to hear back on Suss about availability and lead time.

If you are in desperate need of using the tool with the topside microscope, CNSI's Quantum Structures Facility has one available for use:

https://www.cnsi.ucsb.edu/facilities/quantum-structures/nanofabrication

-Lee

//Vraj Mehalana 14:41, 13 May 2024 (PDT)

Velion FIB Tool DOWN

Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.

//Vraj Mehalana 10:58, 30 April 2024 (PDT)

ASML optics replacement May 20th-22nd

We will be performing beam delivery optics replacement on Mon May 20th to 22nd, to resolve a low intensity reading. The tool will be unavailable during this time.e.

//Vraj Mehalana 09:40, 9 May 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)