Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(119 intermediate revisions by 4 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
  +
=====Atomic Force Microscope (Dimension ICON) - 05/17: System UP=====
  +
Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder!
   
 
//[[User:Mehalana v|Vraj Mehalana]] 13:46, 20 May 2024 (PDT)
=====Dicing Saw (ADT) Upgrade 10/9=====
 
The dicing saw is scheduled go down for an upgrade on Monday October 9th and will be down for that week and into the weekend. Part of the upgrade will be updated software and will require users to be re-trained. I will provide more info on the re-training once I get a little hands on time with the updated software.
 
I'll send out a couple of reminder emails between now and then and keep everyone updated in the event the schedule for this changes.
 
//[[User:Mehalana v|Vraj Mehalana]] 10:33, 6 September 2023 (PDT)
 
   
=====Stepper #1 (GCA 6300) Scheduled Maintenance=====
+
=====MA6 TSA is down - Update=====
  +
Multiple attempts to unbind the Y axis motor have been unsuccessful. The motor may have failed so I am waiting to hear back on Suss about availability and lead time.
The tool has been scheduled for maintenance on 9-28-23 from 8:00am to 5:00pm. During this time the tool will be unavailable for use. Please plan your lab activities accordingly.
 
//[[User:Mehalana v|Vraj Mehalana]] 10:13, 6 September 2023 (PDT)
 
   
  +
If you are in desperate need of using the tool with the topside microscope, CNSI's Quantum Structures Facility has one available for use:
=====SEM 2 is Up=====
 
JEOL has finished will the install and the SEM is available to use if you've received training on SEM #1.
 
//[[User:Hopkins a|Hopkins a]] 15:32, 29 August 2023 (PDT)
 
   
  +
https://www.cnsi.ucsb.edu/facilities/quantum-structures/nanofabrication
=====Plasma Activation (EVG 810)=====
 
  +
We will have an FSE onsite to install the new parts on the tool and verify it is operating correctly. I don't expect this to take more than a few days, but plan for the tool to be down all week.
 
  +
-Lee
//[[User:Mehalana v|Vraj Mehalana]] 10:27, 15 September 2023 (PDT)
 
  +
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:41, 13 May 2024 (PDT)
  +
  +
=====Velion FIB Tool DOWN=====
  +
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
  +
 
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT)
  +
  +
=====ASML optics replacement May 20th-22nd=====
  +
We will be performing beam delivery optics replacement on Mon May 20th to 22nd, to resolve a low intensity reading. The tool will be unavailable during this time.e.
  +
  +
//[[User:Mehalana v|Vraj Mehalana]] 09:40, 9 May 2024 (PDT)
  +
 
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
  +
  +
=====Lab Access Changes: Symmetry App=====
  +
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
  +
  +
=====Wafer Bonder, (Suss SB6-8E)=====
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
   
 
<!--
 
<!--
Line 24: Line 44:
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
 
 
<!---------- end of Equipment Status ------------>
 
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<endfeed />

Revision as of 13:46, 20 May 2024

Atomic Force Microscope (Dimension ICON) - 05/17: System UP

Head was repaired and returned today. A quick test showed correct performance. Note also that the pin board has been repaired so all 4 pins are now present. Lets keep it that way so please be careful when loading the tip holder!

//Vraj Mehalana 13:46, 20 May 2024 (PDT)

MA6 TSA is down - Update

Multiple attempts to unbind the Y axis motor have been unsuccessful. The motor may have failed so I am waiting to hear back on Suss about availability and lead time.

If you are in desperate need of using the tool with the topside microscope, CNSI's Quantum Structures Facility has one available for use:

https://www.cnsi.ucsb.edu/facilities/quantum-structures/nanofabrication

-Lee

//Vraj Mehalana 14:41, 13 May 2024 (PDT)

Velion FIB Tool DOWN

Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.

//Vraj Mehalana 10:58, 30 April 2024 (PDT)

ASML optics replacement May 20th-22nd

We will be performing beam delivery optics replacement on Mon May 20th to 22nd, to resolve a low intensity reading. The tool will be unavailable during this time.e.

//Vraj Mehalana 09:40, 9 May 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)