+ | =====Atomic Force Microscope (Dimension ICON) - 05/08: AFM Head needs repair===== |
||
− | <!--feedBurner name="UCSBNanofab-Announcements" /--> |
||
+ | I will have to take the AFM head unit back to Bruker for repair. The height sensor failed all the tests I tried so the Z-piezo/strain gauge unit will most likely need to be replaced. SO for the foreseeable future, the AFM is down.--Demis |
||
− | <!-- Description of the RSS feed --> |
||
− | '''''Important Announcements''''' |
||
⚫ | |||
− | <!-- |
||
⚫ | |||
+ | //[[User:Mehalana v|Vraj Mehalana]] 13:42, 9 May 2024 (PDT) |
||
⚫ | |||
+ | =====MA6 TSA is down - Update===== |
||
⚫ | |||
+ | After working with our FSE over the phone, we feel the culprit is a bound up Y axis motor for the top side microscope. Unfortunately, this axis is at the bottom of the microscope assembly and will require the removal of both the X and Z axis sub assemblies. I am awaiting proper instructions on how to dismantle all of this and the FSE is also checking with some of their contacts to see if there is an easier solution. |
||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
+ | |||
− | ===== MLA Service: Monday Jan 30th 5:30pm ===== |
||
+ | I have been asked by a few users about using the tool in TSA mode for exposures that do not require alignment even through the topside microscope is not functional. I have just tested the tool in TSA mode and it will work like this, just note that the topside microscope will not come down. |
||
− | The MLA will be down beginning on Monday 1/30 at 5:30 pm and the tool will be unavailable until around 5 pm the following day (Tuesday 1/31). HIMT needs to have Germany remote into the tool that evening to address the software issues we have been having. |
||
− | I will send an email out on Tuesday once the tool is available. |
||
-Lee |
-Lee |
||
⚫ | |||
⚫ | |||
− | All of the damaged parts have been repaired and we should receive them next week. I'm hopeful we'll have the system running by Thursday or Friday. -- Tony |
||
⚫ | |||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:41, 13 May 2024 (PDT) |
||
− | ===== Dektak XT in qualification ===== |
||
− | We have replaced the Dektak 6M with a new Dektak XT profilometer. We are currently qualifying the tool, we'll send an email when it's ready for training. |
||
⚫ | |||
− | ===== |
+ | =====Velion FIB Tool DOWN===== |
+ | Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice. |
||
− | Oven reassembled and tested. |
||
− | Now available for use. |
||
− | // [[User:John d|John d]] 00:52, 27 January 2023 (PST) |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT) |
||
− | ===== Au Plating: DOWN ===== |
||
− | Bath damaged, system is down for repair. |
||
− | // [[User:John d|John d]] 08:48, 27 October 2022 (PDT) |
||
− | ===== |
+ | =====ASML optics replacement May 20th-22nd===== |
+ | We will be performing beam delivery optics replacement on Mon May 20th to 22nd, to resolve a low intensity reading. The tool will be unavailable during this time.e. |
||
− | ICP power supply has failed. We have requested a replacement from the vendor and a timeline for repair. Oxford will have an engineer here next week (mid week) with the hopes of getting the system operational again. With any luck the system will be released by Friday Feb. 3rd afternoon. |
||
− | // [[User:John d|John d]] 15:03, 27 January 2023 (PST) |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 09:40, 9 May 2024 (PDT) |
||
− | <!---------- end of Equipment Status ------------> |
||
− | <!----------------------------------------------> |
||
⚫ | |||
⚫ | |||
− | <!-------------------------------------------- |
||
+ | =====ICP1 Down===== |
||
+ | The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
||
+ | =====Lab Access Changes: Symmetry App===== |
||
+ | Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
||
⚫ | |||
⚫ | |||
+ | SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
====== HOW TO ADD ITEMS ====== |
====== HOW TO ADD ITEMS ====== |
||
− | |||
* You can copy/paste the example below for a new news item. |
* You can copy/paste the example below for a new news item. |
||
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
||
− | * You must add a user signature at the end of each post via four tildes: |
+ | * You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed. |
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
||
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
||
Line 68: | Line 63: | ||
===== NanoFab making LN2 icecream ===== |
===== NanoFab making LN2 icecream ===== |
||
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
||
⚫ | |||
− | // ~~~~ |
||
************* (end of example) ************** |
************* (end of example) ************** |
||
− | The |
+ | The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post. |
----------------------------------------------> |
----------------------------------------------> |
Revision as of 14:41, 13 May 2024
Atomic Force Microscope (Dimension ICON) - 05/08: AFM Head needs repair
I will have to take the AFM head unit back to Bruker for repair. The height sensor failed all the tests I tried so the Z-piezo/strain gauge unit will most likely need to be replaced. SO for the foreseeable future, the AFM is down.--Demis
//Vraj Mehalana 13:42, 9 May 2024 (PDT)
MA6 TSA is down - Update
After working with our FSE over the phone, we feel the culprit is a bound up Y axis motor for the top side microscope. Unfortunately, this axis is at the bottom of the microscope assembly and will require the removal of both the X and Z axis sub assemblies. I am awaiting proper instructions on how to dismantle all of this and the FSE is also checking with some of their contacts to see if there is an easier solution.
I have been asked by a few users about using the tool in TSA mode for exposures that do not require alignment even through the topside microscope is not functional. I have just tested the tool in TSA mode and it will work like this, just note that the topside microscope will not come down.
-Lee
//Vraj Mehalana 14:41, 13 May 2024 (PDT)
Velion FIB Tool DOWN
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
//Vraj Mehalana 10:58, 30 April 2024 (PDT)
ASML optics replacement May 20th-22nd
We will be performing beam delivery optics replacement on Mon May 20th to 22nd, to resolve a low intensity reading. The tool will be unavailable during this time.e.
//Vraj Mehalana 09:40, 9 May 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)