=====Stepper #1 (GCA 6300) - Scheduled Maintenance=====
+
=====Atomic Force Microscope (Dimension ICON) - 05/08: AFM Head needs repair=====
  +
I will have to take the AFM head unit back to Bruker for repair. The height sensor failed all the tests I tried so the Z-piezo/strain gauge unit will most likely need to be replaced. SO for the foreseeable future, the AFM is down.--Demis
The tool will be undergoing maintenance and be unavailable the following dates and times:
 
   
 
//[[User:Mehalana v|Vraj Mehalana]] 13:42, 9 May 2024 (PDT)
1-18-24 at 8:00am to 1-18-24 at 6:00pm
 
 
=====MA6 TSA is down - Update=====
  +
Still waiting on a quote and lead time for the board we need for the TSA microscope issue, was supposed to have that info yesterday. I've just pinged them and will provide everyone with an update once I have something.
   
 
//[[User:Mehalana v|Vraj Mehalana]] 11:15, 1 May 2024 (PDT)
Please plan your processing activities accordingly.
 
  +
=====Velion FIB Tool DOWN=====
  +
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
   
 
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT)
Bill Millerski
 
   
  +
=====ASML optics replacement May 20th-22nd=====
//[[User:Mehalana v|Vraj Mehalana]] 21:49, 21 December 2023 (PST)
 
  +
We will be performing beam delivery optics replacement on Mon May 20th to 22nd, to resolve a low intensity reading. The tool will be unavailable during this time.e.
   
 
//[[User:Mehalana v|Vraj Mehalana]] 09:40, 9 May 2024 (PDT)
===== Stepper #2 (GCA Autostep 200) - Scheduled Maintenance=====
 
The tool will be undergoing maintenance and be unavailable the following dates and times:
 
   
 
=====ICP1 Down=====
1-15-24 at 8:00am to 1-17-24 at 6:00pm
 
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
 
 
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
Please plan your processing activities accordingly.
 
 
//[[User:Mehalana v|Vraj Mehalana]] 21:49, 21 December 2023 (PST)
 
 
=====DUV is down - Update=====
 
Parts were scheduled to arrive last Thursday but were delayed due to the weather that day. Tracking status never updated from pending after that point so I had to wait 7 days before filing a claim with FEDEX. Hopefully the claim and associated dollar value will get them to start looking for the package, and we are also exploring other options.
 
 
I'll hopefully send out another update late next week with some idea of when we will have parts.
 
 
//[[User:Mehalana v|Vraj Mehalana]] 15:27, 2 January 2024 (PST)
 
 
=====PECVD2 Planned Down Time for Maintenance 12-11-23=====
 
PECVD2 will be going down on Monday 12-11-23 at 10:00am for replacement of the RF connector and RF Electrode.
 
 
When the work is complete, the process group will be running tests for the remainder of the afternoon.
 
 
//[[User:Mehalana v|Vraj Mehalana]] 14:07, 13 December 2023 (PST)
 
=====Year End Shutdown=====
 
We will be shutting down lab operations Tuesday Dec 26th at 9 am for year end maintenance activities. The current plan is to be back open for operations Thursday Dec 28th at 2 pm.
 
The staff will be on Holiday Dec 25th & 26th, and January 1st & 2nd.
 
 
//[[User:Mehalana v|Vraj Mehalana]] 14:39, 16 November 2023 (PST)
 
 
=====Job Opening: Process Engineer=====
 
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
 
 
//[[User:Mehalana v|Vraj Mehalana]] 14:52, 30 October 2023 (PDT)
 
   
 
=====Lab Access Changes: Symmetry App=====
 
=====Lab Access Changes: Symmetry App=====
 
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
 
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
 
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
   
 
=====Wafer Bonder, (Suss SB6-8E)=====
 
=====Wafer Bonder, (Suss SB6-8E)=====
SUSS now aims to be on site in early February. I’ll will send out an email once I get confirmation for a specific date.
+
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
 
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
   

Revision as of 13:42, 9 May 2024

Atomic Force Microscope (Dimension ICON) - 05/08: AFM Head needs repair

I will have to take the AFM head unit back to Bruker for repair. The height sensor failed all the tests I tried so the Z-piezo/strain gauge unit will most likely need to be replaced. SO for the foreseeable future, the AFM is down.--Demis

//Vraj Mehalana 13:42, 9 May 2024 (PDT)

MA6 TSA is down - Update

Still waiting on a quote and lead time for the board we need for the TSA microscope issue, was supposed to have that info yesterday. I've just pinged them and will provide everyone with an update once I have something.

//Vraj Mehalana 11:15, 1 May 2024 (PDT)

Velion FIB Tool DOWN

Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.

//Vraj Mehalana 10:58, 30 April 2024 (PDT)

ASML optics replacement May 20th-22nd

We will be performing beam delivery optics replacement on Mon May 20th to 22nd, to resolve a low intensity reading. The tool will be unavailable during this time.e.

//Vraj Mehalana 09:40, 9 May 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)