Difference between revisions of "Template:Announcements"
Jump to navigation
Jump to search
m (update ASML title) |
m (corrected date, COVID on top) |
||
(40 intermediate revisions by 4 users not shown) | |||
Line 6: | Line 6: | ||
<!-- |
<!-- |
||
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS. |
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS. |
||
+ | |||
+ | Please use FIVE equal-signs for the heading level. eg.: ===== my post ===== |
||
--> |
--> |
||
<!----------------------------------------------> |
<!----------------------------------------------> |
||
<!------------- Equipment Status ----------------> |
<!------------- Equipment Status ----------------> |
||
− | ===== |
+ | ===== NanoFab COVID Response ===== |
+ | Following guidelines provided by our Office of Research, the UCSB Nanofabrication Facility is open only for limited/authorized use for critical activity at this time. |
||
− | Level sensor failed. May require hardware replacement for lamp housing, will likely get an ASML technician on site on Monday Jan 6th. |
||
+ | |||
⚫ | |||
+ | Contact the [[Brian Thibeault|Lab Director]] for more information. |
||
+ | |||
+ | // [[User:John d|John d]] 15:00, 19 July 2020 (PDT) |
||
+ | |||
+ | ===== ASML Maintenance: Aug. 11-15th ===== |
||
+ | ASML will be performing a PM from Tues. Aug. 11th to Sat. Aug. 15th. |
||
+ | // [[User:John d|John d]] 14:50, 19 July 2020 (PDT) |
||
+ | |||
+ | ===== New Tool Installations ===== |
||
+ | See the [https://wiki.nanotech.ucsb.edu/w/index.php/Main_Page#mp-trivia-h2 News Feed] for info on two upcoming tool installations! We have a [https://www.raith.com/products/velion.html?mobile=0 Raith Velion FIB] and a [https://heidelberg-instruments.com/en/products/mla150.html Heidelberg MLA150 Maskless Aligner] on the way. |
||
+ | |||
⚫ | |||
===== Unaxis ICP-PECVD ===== |
===== Unaxis ICP-PECVD ===== |
||
− | The ICP-PECVD module is |
+ | The ICP-PECVD module is available upon request. Contact Tony Bosch if interested. System is using deuterated Silane for low loss optical films use only. |
⚫ | |||
+ | // [[User:Thibeault|Thibeault]] 14:22, 26 March 2020 (PDT) |
||
− | ===== Suss Bonder ===== |
||
− | Suss Bonder is DOWN. The vendor is struggling to get the software and hardware upgrades to work. We have a meeting next week, 10/28/19, to discuss options. |
||
⚫ | |||
<!---------- end of Equipment Status ------------> |
<!---------- end of Equipment Status ------------> |
Revision as of 16:35, 19 July 2020
Equipment Status
NanoFab COVID Response
Following guidelines provided by our Office of Research, the UCSB Nanofabrication Facility is open only for limited/authorized use for critical activity at this time.
Contact the Lab Director for more information.
// John d 15:00, 19 July 2020 (PDT)
ASML Maintenance: Aug. 11-15th
ASML will be performing a PM from Tues. Aug. 11th to Sat. Aug. 15th. // John d 14:50, 19 July 2020 (PDT)
New Tool Installations
See the News Feed for info on two upcoming tool installations! We have a Raith Velion FIB and a Heidelberg MLA150 Maskless Aligner on the way.
// John d 17:48, 2 June 2020 (PDT)
Unaxis ICP-PECVD
The ICP-PECVD module is available upon request. Contact Tony Bosch if interested. System is using deuterated Silane for low loss optical films use only.
// Thibeault 14:22, 26 March 2020 (PDT)