Template:Announcements

From UCSB Nanofab Wiki
Revision as of 14:00, 30 December 2019 by John d (talk | contribs) (Undo revision 157023 by John d (talk))
Jump to navigation Jump to search

Equipment Status


Nanofab is OPEN

The cleanroom is now open. // John d 08:50, 28 December 2019 (PST)

ASML is DOWN

Level sensor failed. ASML support staff is unavailable until Jan 2nd due to vacations. Will work on it as soon as we get info from ASML. // John d 10:54, 30 December 2019 (PST)

Unaxis ICP-PECVD

The ICP-PECVD module is down for general use. We are conducting experiments with the Deuterated Silane and are not allowing general use of the tool. Silva 15:04, 19 November 2019 (PST)

Suss Bonder

Suss Bonder is DOWN. The vendor is struggling to get the software and hardware upgrades to work. We have a meeting next week, 10/28/19, to discuss options. Silva 11:16, 25 October 2019 (PDT)