Template:Announcements

From UCSB Nanofab Wiki
Revision as of 08:39, 18 September 2019 by John d (talk | contribs) (ASML PM)
Jump to navigation Jump to search

Equipment Status

ASML Stepper: Maintenance Sept 30 - Oct 4

ASML will be performing quarterly maintenance from Monday Sept. 30th to Friday Oct. 4th, please plan for the tool to be down during this time. // John d 08:39, 18 September 2019 (PDT)

Logitech Wafer Bonder: Down

There's an issue with the heater and chamber assembly, awaiting replacement parts for the repair. Estimate 3 weeks to receive the replacement part. Silva 09:42, 12 September 2019 (PDT)

Suss Bonder

Suss Bonder is DOWN. The vendor installed all the hardware but failed to get the software to work. The vendor will be back sometime next week, the week of the 16th, to complete the repair/upgrade. Silva 15:59, 13 September 2019 (PDT)