Template:Announcements

From UCSB Nanofab Wiki
Revision as of 09:43, 17 May 2019 by Hopkins a (talk | contribs)
Jump to navigation Jump to search

Equipment Status

Suss Bonder

Suss Bonder is DOWN. Suss field service is sourcing replacement parts for the bonder repair. An update will be sent out once we have a date scheduled for the service. Silva 10:45, 12 April 2019 (PDT)

SLR Fluorine ICP Etch

The system will be down May 23 and May 24, 2019 to integrate a new maglev turbo pump. Silva 07:15, 2 May 2019 (PDT)

Lab Shutdown for Exhaust Fan Installation

The cleanroom will be DOWN from 7am to ~1pm on Friday, May 24th. An email will be sent out once the lab is back up and running. Hopkins a 09:43, 17 May 2019 (PDT)