Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
Line 9: Line 9:
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
   
===== Power Outage: Sept. 14-15 =====
+
===== XeF2: Down =====
  +
A 24vdc power supply has failed. A new supply will arrive 9/17/2019. I will send out an email once the system is up and running.
The cleanroom will be closed Saturday afternoon starting at 5:00pm. We will recover the cleanroom once power is restored. We have a time frame between 10:00am and 2:00pm. An email will be sent out once we are back on line.
 
[[User:Silva|Silva]] 12:53, 13 September 2019 (PDT)
+
[[User:Silva|Silva]] 12:11, 16 September 2019 (PDT)
 
===== Fire Alarm Testing Monday, Sept. 16th =====
 
Life Safety Services will be here Monday morning at 7:30am to conduct their annual test of the building's fire alarm system.
 
Users will not be allowed inside the cleanroom during this time. An email will be sent out ~8-8:30am once the lab is safe to enter.
 
[[User:Hopkins a|Hopkins a]] 10:41, 11 September 2019 (PDT)
 
   
 
===== Logitech Wafer Bonder: Down =====
 
===== Logitech Wafer Bonder: Down =====

Revision as of 12:11, 16 September 2019

Equipment Status

XeF2: Down

A 24vdc power supply has failed. A new supply will arrive 9/17/2019. I will send out an email once the system is up and running. Silva 12:11, 16 September 2019 (PDT)

Logitech Wafer Bonder: Down

There's an issue with the heater and chamber assembly, awaiting replacement parts for the repair. Estimate 3 weeks to receive the replacement part. Silva 09:42, 12 September 2019 (PDT)

Suss Bonder

Suss Bonder is DOWN. The vendor installed all the hardware but failed to get the software to work. The vendor will be back sometime next week, the week of the 16th, to complete the repair/upgrade. Silva 15:59, 13 September 2019 (PDT)