===== PECVD #2: UP with possible High Particulates =====
 
We are still experiencing high particle counts in the Advanced Vacuum
 
PECVD process. Our next step is to replace the Silane MFC. I will
 
update you once I have a lead time on the new MFC. Most likely it will
 
take several weeks to receive. Until then, the system is operational
 
and can be used if your process is not sensitive to high particle
 
counts.
 
// [[User:John d|Posted:]] 13:22, 19 March 2018 (PDT)
 
 
===== Gasonics: Up =====
 
The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to be repaired and returned.
 
// [[User:John d|Posted:]] 10:14, 12 February 2018 (PST)
 
   
 
===== Cary 500 Down =====
 
===== Cary 500 Down =====

Revision as of 17:18, 19 April 2018

UCSB NanoFab Announcements

PECVD#2 Upgrade, Retraining required

Plasmatherm will be here Monday April 16, 2018 to upgrade the system software. The user interface will be completely different from what it is now. All users will be disqualified and will need to be retrained to access the system through Signupmonkey. We will schedule training sessions for the middle of next week. // John d 17:53, 13 April 2018 (PDT)

RIE#5 Down Thurs 4/19

RIE #5 will be down al day next Thursday 4/19/18 so that we can work on the SiCl4 gas line. We are going to install a new MFC and some other components and we need a long time to pump and purge the line. // John d 13:48, 12 April 2018 (PDT)

ADT Dicing Saw: Intermittent Software Issue

One of the DB files keeps getting corrupted. We've restored the system back to the backup created yesterday afternoon and the saw is up and running. Looking into a longer term fix. If you created a new recipe within the last 5 days you may need to re-create it. // John d 21:43, 27 March 2018 (PDT)

EBeam #4: Re-Training Required

The upgrade is complete and working well. All users will be required to be trained again. The high voltage, sweep and turret controls are all new. // John d 12:13, 26 March 2018 (PDT)

Cary 500 Down

UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options. // Posted: 13:47, 12 February 2018 (PST)