''Equipment Status''
+
'''''Equipment Status'''''
  +
----
 
<!--
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS.
 
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS.
Line 9: Line 10:
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
   
===== GCA Autostep Maintenance Sept 23 - Sept 25 =====
+
===== GCA Autosetp Maintenance =====
  +
The system will be down for service Monday January 20, 2020 until late afternoon Wednesday January 22nd.
3C Technical will be here to service the GCA Autostep from Monday September 23 thru Wednesday September 25. The service will begin at 8:00am Monday morning, and will conclude by 6:00pm Wednesday.
 
[[User:Silva|Silva]] 10:36, 18 September 2019 (PDT)
+
[[User:Silva|Silva]] 08:14, 16 January 2020 (PST)
   
===== GCA 6300 Maintenance Sept 26 =====
+
===== GCA 6300 Maintenance =====
3C Technical will be here to service the GCA 6300 on Thursday September 26. The service will begin at 8:00am Thursday morning, and will finish by 6:00pm that day.
+
The system will be down for service Thursday January 23, 2020 until late afternoon.
[[User:Silva|Silva]] 10:36, 18 September 2019 (PDT)
+
[[User:Silva|Silva]] 08:15, 16 January 2020 (PST)
   
===== ASML Stepper: Maintenance Sept 30 - Oct 4 =====
+
===== MOVED: ASML Maintenance: March 30th =====
ASML will be performing quarterly maintenance from Monday Sept. 30th to Friday Oct. 4th, please plan for the tool to be down during this time.
+
Accommodating user requests, we have moved the periodic maintenance to Monday March 30th. The PM will still be on the order of 1.5 weeks at that time. Please let me know if you have any questions or see any calibration drifts in the mean time.
// [[User:John d|John d]] 08:39, 18 September 2019 (PDT)
+
// [[User:John d|John d]] 16:25, 16 January 2020 (PST)
   
===== Logitech Wafer Bonder: Down =====
+
===== Unaxis ICP-PECVD =====
  +
The ICP-PECVD module is down for general use. We are conducting experiments with the Deuterated Silane and are not allowing general use of the tool.
There's an issue with the heater and chamber assembly, awaiting replacement parts for the repair. Estimate 3 weeks to receive the replacement part.
 
[[User:Silva|Silva]] 09:42, 12 September 2019 (PDT)
+
[[User:Silva|Silva]] 15:04, 19 November 2019 (PST)
   
 
===== Suss Bonder =====
 
===== Suss Bonder =====
Suss Bonder is DOWN. The vendor installed all the hardware but failed to get the software to work. The vendor will be back sometime next week, the week of the 16th, to complete the repair/upgrade.
+
Suss Bonder is DOWN. The vendor is struggling to get the software and hardware upgrades to work. We have a meeting next week, 10/28/19, to discuss options.
[[User:Silva|Silva]] 15:59, 13 September 2019 (PDT)
+
[[User:Silva|Silva]] 11:16, 25 October 2019 (PDT)
 
   
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>

Revision as of 17:25, 16 January 2020

Equipment Status


GCA Autosetp Maintenance

The system will be down for service Monday January 20, 2020 until late afternoon Wednesday January 22nd. Silva 08:14, 16 January 2020 (PST)

GCA 6300 Maintenance

The system will be down for service Thursday January 23, 2020 until late afternoon. Silva 08:15, 16 January 2020 (PST)

MOVED: ASML Maintenance: March 30th

Accommodating user requests, we have moved the periodic maintenance to Monday March 30th. The PM will still be on the order of 1.5 weeks at that time. Please let me know if you have any questions or see any calibration drifts in the mean time. // John d 16:25, 16 January 2020 (PST)

Unaxis ICP-PECVD

The ICP-PECVD module is down for general use. We are conducting experiments with the Deuterated Silane and are not allowing general use of the tool. Silva 15:04, 19 November 2019 (PST)

Suss Bonder

Suss Bonder is DOWN. The vendor is struggling to get the software and hardware upgrades to work. We have a meeting next week, 10/28/19, to discuss options. Silva 11:16, 25 October 2019 (PDT)