Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(ASML up)
(ASML PM Feb)
Line 13: Line 13:
 
Laser Gas Fill enabled. System calibrated, ready for use.
 
Laser Gas Fill enabled. System calibrated, ready for use.
 
// [[User:John d|John d]] 09:27, 13 January 2020 (PST)
 
// [[User:John d|John d]] 09:27, 13 January 2020 (PST)
  +
  +
===== ASML Maintenance: Feb 10th - 19th =====
  +
System will be unavailable from Monday Feb 10th to Wednesday Feb 19th.
  +
May be able to open up the system earlier depending on how the work goes.
  +
// [[User:John d|John d]] 16:03, 14 January 2020 (PST)
   
 
===== Unaxis ICP-PECVD =====
 
===== Unaxis ICP-PECVD =====

Revision as of 17:03, 14 January 2020

Equipment Status


ASML is UP

Laser Gas Fill enabled. System calibrated, ready for use. // John d 09:27, 13 January 2020 (PST)

ASML Maintenance: Feb 10th - 19th

System will be unavailable from Monday Feb 10th to Wednesday Feb 19th. May be able to open up the system earlier depending on how the work goes. // John d 16:03, 14 January 2020 (PST)

Unaxis ICP-PECVD

The ICP-PECVD module is down for general use. We are conducting experiments with the Deuterated Silane and are not allowing general use of the tool. Silva 15:04, 19 November 2019 (PST)

Suss Bonder

Suss Bonder is DOWN. The vendor is struggling to get the software and hardware upgrades to work. We have a meeting next week, 10/28/19, to discuss options. Silva 11:16, 25 October 2019 (PDT)