Template:Announcements

From UCSB Nanofab Wiki
Revision as of 12:13, 1 June 2022 by John d (talk | contribs) (plating bench down 6/7th)
Jump to navigation Jump to search

Important Announcements


NanoFab OPEN

HVAC maintenance is complete, the cleanroom is back open for use. // John d 10:13, 1 June 2022 (PDT)

Plating Bench: Down 6/7 9a-12n

The plating bench in Bay 4 will be unavailable on Wednesday, 6/7/22 from 9am-noon. Please plan accordingly. // John d 12:13, 1 June 2022 (PDT)

Masks Mandatory: May 27-June 12

UCSB has reinstituted a mandatory mask mandate for all indoor spaces on campus.

The mandate begins tomorrow, May 27, and extends through June 12.

See the full announcement at this link.

We will provide masks at the metal table in front of the cleanroom entry.

See the full policies at COVID-19_User_Policies // John d 15:48, 26 May 2022 (PDT)

Unaxis-Dep: Down

Deuterated Silane (SiD4) is out. Expected bottle delivery week of May 30th. // John d 09:28, 25 May 2022 (PDT)

New EBL Rates

Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows:

Industrial Users: $405/hour

UC Academic Users: $126/hour

Non-UC Academic Users: $150/hour

UCSB CNSI Incubator USers: $260/hour

//Thibeault 12:21, 9 December 2021 (PST)