Template:Announcements

From UCSB Nanofab Wiki
Revision as of 12:32, 5 April 2019 by Hopkins a (talk | contribs)
Jump to navigation Jump to search

Equipment Status

Suss Bonder

Suss fieldservice found several issues with the system. Suss will evaluate the issues and recommend possible solutions. // Silva 21:36, 13 February 2019 (PST)

GCA Autostep 200 Maintenance

There is a problem with the RMS power supply. The vendor is having a new supply shipped overnight to replace the failing unit. The system will be down until 5:00 pm tomorrow afternoon. Silva 15:40, 4 April 2019 (PDT)

FEI SEM is DOWN

The replacement tip has been installed the system is up for lower mag imaging (<50k). FEI will be back early next week to install a brand new tip. The service should take approximately 3 days to complete. Hopkins a 16:54, 26 March 2019 (PDT)