Template:Announcements

From UCSB Nanofab Wiki
Revision as of 16:14, 11 June 2018 by John d (talk | contribs) (lab reopened update, deleted DSE wafer removed)
Jump to navigation Jump to search

UCSB NanoFab Announcements

Lab Re-Opened

Maintenance is complete. // John d 16:14, 11 June 2018 (PDT)

AFM Down

The laser/laser focus is struggling on the AFM. I will be removing the head and taking it to Bruker for a tune-up/repair this afternoon. The system will be down until some time this week. // John d 11:07, 8 June 2018 (PDT)

Solvent Bench Bay 7 - Heated Bath

We have disabled the auto refill due to a high water level. Please use the manual fill and a manual drain button at the center top of the head case. Users of the bath might need to fill or drain as you insert/remove your beakers. Please be careful with other user's beakers. // John d 17:18, 6 June 2018 (PDT)

RIE#5: No SiCl4

We have received a new bottle of SiCl4 and we are installing a new gas panel. We will notify you when the gas is available. // John d 17:00, 4 June 2018 (PDT)

PECVD#2 is Up

The Plasma Therm Cortex software update is complete, and the system is operational. Standard recipes requalified. Particle counts are now much lower and around historical levels. All users need retraining on the new software. Contact Mike Silva for training. // Thibeault 17:25, 24 May 2018 (PDT)