Template:Announcements

From UCSB Nanofab Wiki
Revision as of 22:44, 19 February 2018 by John d (talk | contribs) (→‎Gasonics: Up: grammar)
Jump to navigation Jump to search

UCSB NanoFab Announcements

Announcements

There are no general announcements at this time. // Posted: 09:58, 4 January 2018 (PST)

ICP#1: Up

He cooling fixed. // Posted: 01:32, 15 February 2018 (PST)

JEOL SEM #2: Up

System up for use. JEOL service returning on Tues for permanent fix. // Posted: 22:30, 16 February 2018 (PST)

Gasonics: Up

The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to be repaired and returned. // Posted: 10:14, 12 February 2018 (PST)

Cary 500 Down

UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options. // Posted: 13:47, 12 February 2018 (PST)