Template:Announcements
Jump to navigation
Jump to search
UCSB NanoFab Announcements
Announcements
There are no general announcements at this time. // Posted: 09:58, 4 January 2018 (PST)
ICP#1: Down
There is a problem with the backside He cooling. Posted: 13:41, 14 February 2018 (PST)
JEOL SEM #2: Down
Load Lock problem. // Posted: 13:40, 14 February 2018 (PST)
Gasonics: Up
The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to repaired and returned. // Posted: 10:14, 12 February 2018 (PST)
Cary 500 Down
UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options. // Posted: 13:47, 12 February 2018 (PST)