Template:Announcements

From UCSB Nanofab Wiki
Revision as of 11:15, 12 February 2018 by John d (talk | contribs) (sig)
Jump to navigation Jump to search

UCSB NanoFab Announcements

Announcements

There are no general announcements at this time.

// Posted:  09:58, 4 January 2018 (PST)
Gasonics Down

Check email for updates.

// Posted: 10:14, 12 February 2018 (PST) 
ASML Up

ASML Stepper #3 periodic maintenance is complete. System is ready for use.

// Posted: 18:52, 10 February 2018 (PST)
JEOL SEM #2

Problem with load lock gate valve. Currently down.

// Posted:  15:40, 8 February 2018 (PST)
Cary 500

UV-Vis Detector Failure. Tool is able to used from 600nm and up. Locating replacement PMT detector.

// Posted: 15:06, 7 December 2017 (PST)