Equipment Status

Suss Bonder

The system is down. We are waiting for fieldservce. Silva 10:18, 4 February 2019 (PST)

KLA Tencor Surfscan

The system is down. We are sourcing a replacement PCB. Silva 10:20, 4 February 2019 (PST)

ALD Metal Dep

The system is down. The lead time for the replacement turbo pump is three weeks. Silva 10:44, 4 February 2019 (PST)

E-Beam#1

We will start the power supply upgrade Monday morning February 11, 2019. We are planning on 10 working days to complete the retrofit. All users will need to be trained on the new control system. Silva 08:35, 6 February 2019 (PST)

Advanced Vacuum PECVD#2

The system is down. There is a large vacuum leak in the main chamber. I must cool the chuck down to inspect the assembly. The system will be down until tomorrow afternoon. Silva 16:09, 6 February 2019 (PST)