Template:Announcements

From UCSB Nanofab Wiki
Revision as of 10:25, 5 February 2019 by Silva (talk | contribs)
Jump to navigation Jump to search

Equipment Status

Suss Bonder

The system is down. We are waiting for fieldservce. Silva 10:18, 4 February 2019 (PST)

KLA Tencor Surfscan

The system is down. We are sourcing a replacement PCB. Silva 10:20, 4 February 2019 (PST)

ALD Metal Dep

The system is down. The lead time for the replacement turbo pump is three weeks. Silva 10:44, 4 February 2019 (PST)

SUSS MA6

The system is down. The vendor is coming to PM the system and look at the lamp power supply. Silva 09:25, 5 February 2019 (PST)