Template:Announcements

From UCSB Nanofab Wiki
Revision as of 16:58, 4 February 2019 by John d (talk | contribs) (added comments with RSS feed URLs)
Jump to navigation Jump to search

Equipment Status

Suss Bonder

The system is down. We are waiting for fieldservce. Silva 10:18, 4 February 2019 (PST)

KLA Tencor Surfscan

The system is down. We are sourcing a replacement PCB. Silva 10:20, 4 February 2019 (PST)

ALD Metal Dep

The system is down. The lead time for the replacement turbo pump is three weeks. Silva 10:44, 4 February 2019 (PST)