Template:Announcements
Equipment Status
Suss Bonder
The system is down. We are waiting for fieldservce. Silva 10:18, 4 February 2019 (PST)
KLA Tencor Surfscan
The system is down. We are sourcing a replacement PCB. Silva 10:20, 4 February 2019 (PST)
ALD Metal Dep
The system is down. The lead time for the replacement turbo pump is three weeks. Silva 10:44, 4 February 2019 (PST)
SUSS MA6
The system is down. The vendor is coming to PM the system and look at the lamp power supply. The system should be ready to use by 5 pm. Silva 09:25, 5 February 2019 (PST)