Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(corrected EB3 --> EB2, AUtostep down RMS)
(AutoStep up.)
Line 18: Line 18:
 
// [[User:John d|John d]] 14:27, 21 September 2022 (PDT)
 
// [[User:John d|John d]] 14:27, 21 September 2022 (PDT)
   
===== Stepper #2 (Autostep): Down =====
+
===== Stepper #2 (Autostep): UP =====
 
System up. Please note the maintenance schedule this week. // [[User:John d|John d]] 10:54, 26 September 2022 (PDT)
The tool remains down while we work with the vendor to resolve the issue with the reticle handler.
 
// [[User:John d|John d]] 07:34, 22 September 2022 (PDT)
 
   
 
===== E-Beam#2: Heater Down =====
 
===== E-Beam#2: Heater Down =====

Revision as of 10:54, 26 September 2022

Important Announcements


SEM#1 (FEI): UP

The field service engineer has finished with the alignments and the system is ready to use. // John d 14:27, 21 September 2022 (PDT)

Stepper #2 (Autostep): UP

System up. Please note the maintenance schedule this week. // John d 10:54, 26 September 2022 (PDT)

E-Beam#2: Heater Down

EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)

GCA AutoStep Service

Stepper #2 (GCA AutoStep200) will be unavailable for use while maintenance tasks are performed on the following dates: 9-26-22 8am to 9-27-22 5pm.

// John d 08:30, 19 September 2022 (PDT)

GCA 6300 Service

GCA 6300 will not be available for use while it is undergoing maintenance activities on 9-28-22 & 9-29-22.

// John d 08:33, 19 September 2022 (PDT)

MLA 150 Service & Software Revision

The MLA will be down beginning the evening of Monday October 3rd and should be back up sometime Friday October 7th. // L Sawyer 13:32, 31 August 2022 (PDT)

ASML Up; Network status

Nanofiles sync & JobCreator functionality is in the process of being restored. Batch_Reports are now syncing. JobCreator is working but local scripts are still being written + tested.

// John d 01:53, 17 September 2022 (PDT)