Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(addd lab shutdown, remove ASML)
m (deleted lab shutdown)
Line 11: Line 11:
 
<!---------------------------------------------->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
 
===== Lab Shutdown: Sat. Aug. 22nd morning =====
 
The cleanroom will be closed for the morning shift this Saturday to allow for FM to run some tests on our emergency generator. The lab will open back up at 1:15pm. We will have to shutdown and start up the majority of the tools so any piece of equipment with a cryo pump (ebeam #1, #2, #4, etc) will be down until late in the afternoon. Staff will send out updates on the systems that will need time to recover. Please plan accordingly.
 
// [[User:Hopkins a|Hopkins a]] 06:00, 19 August 2020 (PDT)
 
   
 
===== NanoFab COVID Response =====
 
===== NanoFab COVID Response =====

Revision as of 13:33, 24 August 2020

Equipment Status


NanoFab COVID Response

Following guidelines provided by our Office of Research, the UCSB Nanofabrication Facility is open only for limited/authorized use for critical activity at this time.

Contact the Lab Director for more information.

// John d 15:00, 19 July 2020 (PDT)

New Tool Installations

See the News Feed for info on two upcoming tool installations! We have a Raith Velion FIB and a Heidelberg MLA150 Maskless Aligner on the way.

// John d 17:48, 2 June 2020 (PDT)

Unaxis ICP-PECVD

The ICP-PECVD module is available upon request. Contact Tony Bosch if interested. System is using deuterated Silane for low loss optical films use only.

// Thibeault 14:22, 26 March 2020 (PDT)