Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(→‎Logitech Wafer Bonder: Down: 3 week estiamte for repalcement part delivery)
Line 14: Line 14:
 
We will update with more information closer to the outage date. Please plan accordingly.
 
We will update with more information closer to the outage date. Please plan accordingly.
 
// [[User:John d|John d]] 17:47, 22 August 2019 (PDT)
 
// [[User:John d|John d]] 17:47, 22 August 2019 (PDT)
  +
  +
===== Fire Alarm Testing Monday, Sept. 16th =====
  +
Life Safety Services will be here Monday morning at 7:30am to conduct their annual test of the building's fire alarm system.
  +
Users will not be allowed inside the cleanroom during this time. An email will be sent out ~8-8:30am once the lab is safe to enter.
  +
[[User:Hopkins a|Hopkins a]] 10:41, 11 September 2019 (PDT)
   
 
===== Logitech Wafer Bonder: Down =====
 
===== Logitech Wafer Bonder: Down =====

Revision as of 10:41, 11 September 2019

Equipment Status

Power Outage: Sept. 14-15

The cleanroom will be closed during a campus-wide power outage, due to Edison maintenance. The outage will take place on Saturday Sept. 14th at 10pm until Sunday Sept. 15 afternoon. We will update with more information closer to the outage date. Please plan accordingly. // John d 17:47, 22 August 2019 (PDT)

Fire Alarm Testing Monday, Sept. 16th

Life Safety Services will be here Monday morning at 7:30am to conduct their annual test of the building's fire alarm system. Users will not be allowed inside the cleanroom during this time. An email will be sent out ~8-8:30am once the lab is safe to enter. Hopkins a 10:41, 11 September 2019 (PDT)

Logitech Wafer Bonder: Down

There's an issue with the external transformer, awaiting replacement parts for the repair. Estimate 3 weeks to receive the replacement part. // John d 08:52, 11 September 2019 (PDT)

Suss Bonder

Suss Bonder is DOWN. The upgrade parts have been received and the SUSS FSE will arrive this coming Wednesday August 28, 2019 to start the installation. Silva 15:42, 20 August 2019 (PDT)