Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
Line 12: Line 12:
 
Suss fieldservice found several issues with the system. Suss will evaluate the issues and recommend possible solutions.
 
Suss fieldservice found several issues with the system. Suss will evaluate the issues and recommend possible solutions.
 
// [[User:Silva|Silva]] 21:36, 13 February 2019 (PST)
 
// [[User:Silva|Silva]] 21:36, 13 February 2019 (PST)
 
===== GCA Autostep 200 Maintenance =====
 
There is a problem with the RMS power supply. The vendor is having a new supply shipped overnight to replace the failing unit. The system will be down until 5:00 pm tomorrow afternoon.
 
[[User:Silva|Silva]] 15:40, 4 April 2019 (PDT)
 
   
 
===== FEI SEM is DOWN =====
 
===== FEI SEM is DOWN =====

Revision as of 17:28, 5 April 2019

Equipment Status

Suss Bonder

Suss fieldservice found several issues with the system. Suss will evaluate the issues and recommend possible solutions. // Silva 21:36, 13 February 2019 (PST)

FEI SEM is DOWN

The replacement tip has been installed the system is up for lower mag imaging (<50k). FEI will be back early next week to install a brand new tip. The service should take approximately 3 days to complete. Hopkins a 16:54, 26 March 2019 (PDT)