Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(lab open, deleted exhaust shutdown)
Line 8: Line 8:
 
<!---------------------------------------------->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
  +
===== Lab is OPEN =====
  +
Campus facilities finished the exhaust fan install sooner than expected. Cleanroom exhaust is up and running and the lab is safe to enter.
 
// [[User:John d|John d]] 09:37, 24 May 2019 (PDT)
   
 
===== Suss Bonder =====
 
===== Suss Bonder =====
Line 17: Line 20:
 
[[User:Silva|Silva]] 07:15, 2 May 2019 (PDT)
 
[[User:Silva|Silva]] 07:15, 2 May 2019 (PDT)
   
===== Lab Shutdown for Exhaust Fan Installation=====
 
The cleanroom will be DOWN from 7am to ~1pm on Friday, May 24th. An email will be sent out once the lab is back up and running.
 
[[User:Hopkins a|Hopkins a]] 09:43, 17 May 2019 (PDT)
 
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>
 
<!---------------------------------------------->
 
<!---------------------------------------------->

Revision as of 09:37, 24 May 2019

Equipment Status

Lab is OPEN

Campus facilities finished the exhaust fan install sooner than expected. Cleanroom exhaust is up and running and the lab is safe to enter. // John d 09:37, 24 May 2019 (PDT)

Suss Bonder

Suss Bonder is DOWN. Suss field service is sourcing replacement parts for the bonder repair. An update will be sent out once we have a date scheduled for the service. Silva 10:45, 12 April 2019 (PDT)

SLR Fluorine ICP Etch

The system will be down May 23 and May 24, 2019 to integrate a new maglev turbo pump. Silva 07:15, 2 May 2019 (PDT)