Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
Line 13: Line 13:
 
// [[User:Silva|Silva]] 21:36, 13 February 2019 (PST)
 
// [[User:Silva|Silva]] 21:36, 13 February 2019 (PST)
   
===== FEI SEM is DOWN =====
+
===== FEI SEM is UP =====
 
The replacement tip has been installed the system is up for lower mag imaging (<50k). FEI will be back early next week to install a brand new tip. The service should take approximately 3 days to complete.
 
The replacement tip has been installed the system is up for lower mag imaging (<50k). FEI will be back early next week to install a brand new tip. The service should take approximately 3 days to complete.
 
[[User:Hopkins a|Hopkins a]] 16:54, 26 March 2019 (PDT)
 
[[User:Hopkins a|Hopkins a]] 16:54, 26 March 2019 (PDT)

Revision as of 17:30, 5 April 2019

Equipment Status

Suss Bonder

Suss fieldservice found several issues with the system. Suss will evaluate the issues and recommend possible solutions. // Silva 21:36, 13 February 2019 (PST)

FEI SEM is UP

The replacement tip has been installed the system is up for lower mag imaging (<50k). FEI will be back early next week to install a brand new tip. The service should take approximately 3 days to complete. Hopkins a 16:54, 26 March 2019 (PDT)