Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
Line 20: Line 20:
 
The system is down. The lead time for the replacement turbo pump is three weeks.
 
The system is down. The lead time for the replacement turbo pump is three weeks.
 
[[User:Silva|Silva]] 10:44, 4 February 2019 (PST)
 
[[User:Silva|Silva]] 10:44, 4 February 2019 (PST)
 
===== SUSS MA6 =====
 
The system is down. The vendor is coming to PM the system and look at the lamp power supply. The system should be ready to use by 5 pm.
 
[[User:Silva|Silva]] 09:25, 5 February 2019 (PST)
 
   
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>

Revision as of 18:28, 5 February 2019

Equipment Status

Suss Bonder

The system is down. We are waiting for fieldservce. Silva 10:18, 4 February 2019 (PST)

KLA Tencor Surfscan

The system is down. We are sourcing a replacement PCB. Silva 10:20, 4 February 2019 (PST)

ALD Metal Dep

The system is down. The lead time for the replacement turbo pump is three weeks. Silva 10:44, 4 February 2019 (PST)